ZYYX35-152 Stud roll forming machine
Condition:New | Type:dry wall forming machine | Tile Type:Steel | Use:channel |
Production Capacity:6-8m/min | Place of Origin:Zhejiang China (Mainland) | Brand Name:Zhongyuan | Model Number:ZYYX |
Power(W):7.7KW | Voltage:380V/3Phase/50HZ | Dimension(L*W*H):6m x 1.5m x 1.4m | Weight:5000kgs |
Certification:BV & SGS | Warranty:1 year | After-sales Service Provided:Engineers available to service machinery overseas |
stud roll forming machine
1. Machine components:
Roll forming machine consists of uncoiler, coil sheet guiding device, main roll forming system, cutting device, Hydraulic station, PLC control system and support table.
2. Technical Parameters:
Item | Specification | |
Material | Type | Pre-painted steel coil & galvanized coils |
Thickness | 0.3-0.7mm | |
Yield strength | 235-345Mpa | |
Roller material | 45#Chrome steel | |
Forming speed | About 20m/min | |
Output speed | 10m/min | |
Speed adjusting mode | AC Frequency | |
Roller drive | Decelerating motor + Chain drive | |
Cutting mode | Hydraulic cutting | |
Cutter material | Cr12 mould steel | |
Length measurement | Encoder | |
Control mode | Mitsubishi PLC | |
Operating mode | Button + Mitsubishi Touch screen | |
Main motor power(kw) | 4KW | |
Hydraulic station motor power(kw) | 2.2 KW |
3. Material of Main Equipment
1). Roller Material: High grade No.45 forged steel, with digital-controlled procession, Surface of rollers is plated with hard chrome with thickness of 0.05mm.
2). Active Shaft Material: High grade No.45 carbon wrought steel,which can improve the integrated mechanic feature of the shaft
3). Electric Elements: PLC control panel, transducer imported from Mitsubishi of Japan. Other elements from famous suppliers in China
4). Cutter blade: Cr12 mould steel with quenched treatment
Packaging Detail:1. One 20feet container for loading one set machine with mechanical decoiler. 2. Main machine body and decoiler is load naked (tighten to container with steel wire rope). 3. Spare parts and operating tools are loading in tooling box. |
Delivery Detail:within 50 days after receipt down payment. |