ZG 114 high frequency welded pipe production line
Condition:New | Type:Pipe Production Line | Pipe Material:Carbon Steel | Application:decoration,building ,furniture and so on |
Production Capacity:15-60M/min according to different size and thickness | Place of Origin:China (Mainland) | Brand Name:Nanyang | Model Number:ZG114 |
Voltage:440V/50Hz,440V/60Hz,380V/50Hz,380V/60Hz and so on | Power(W):About 850KW for whole line | Dimension(L*W*H):85*9*2.8 | Weight:About 90Ton |
Certification:CE ISO9001:2000 | Warranty:One year | After-sales Service Provided:Engineers available to service machinery overseas | Color:General Green or Blue, we can also follow your idea |
product name | ZG 114 high frequency welded pipe production line | ||
Sales status | As a excellent welded pipe production line manufacturer in China ,we have about 30 year experience to design and producing it. Every year we sales about 300 production line , achieve the Famous brand of Jiangsu province. Good quality and high credibility is why we surviving and leading the market | ||
Basic components | Uncoiler→Straightening end of strip→Powerful leveling machine→Shear and end welder→Horizontal-type accumulator→Main machine(Forming, welding, sizing)→Computer-controlled tracking cutting saw→Run-out table. | ||
main technical parameters | Round tube diameter | Φ50mm~Φ127mm | |
Round tube thickness | δ1.5mm~5.0mm | ||
Square tube size | 40×40~100×100mm | ||
Square tube thickness | δ1.5mm~4.0mm | ||
Rolling speed | 15M/min~60M/min | ||
Main brand of some parts | Bearing | HRB | |
HF welding machine | Red star or Sanyi | ||
Main drive system | Heng li | ||
Electric control system | Contor | ||
Hydraulic elements | Yuken | ||
Pneumatic elements | Airtac | ||
Description | 1 Uncoiler : The function of this part is to separating the steel strip coil and become to the raw material to roll forming . The steel strip coil will be brought in to the below of the double-drill uncoiler, hydraulic cylinder support the steel strip coil to the centre of the double-drill uncoiler , double-drill uncoiler began moving to hold the steel strip coil, coil car fall off by hydraulic cylinder and go back. 2 Flattening and leveling machine The function of this part is to separating the front head of steel strip on the uncoiler,also reversed bending the steel coil head to adjusting it’s character of inner curl. Steel strip will enter into the flattening machine by dynamic rubber roll. Flattening machine equipped with one set of pinch roll device and five roll leveling device ,there is one pairs centring device in front and behind. 3 Shearing and butt-welding machine The function of this part is using hydraulic knife to cutting the irregular part in the front and end of the steel strip through the motor controlled by the human. Adjusting the size of the welding seam, translation hydraulic cylinder moving it to the welding position, two welding platen pressing it than moving the welding gun to the position of welding seam. Opening the motor ,welding and connecting two steel strip by using carbon dioxide arc welding ,polishing and flattening the welding seam by human, so the machine can working continuous. Shear and butt-welder is consist of :electric control operating table,hydraulic station,welding machine,pinch system,lathe bed system(lathe bed and washer adjusting device),centring system(steel strip end fixed and front head of steel strip translation device ),crane system,cutting system(cutting device and cutting platen) and welding system(welding tractor and welding platen). Working flow: end of the steel strip enter into the position before cutting –fixed the end of the steel strip-cutting the end of the steel stirp-front head of steel strip enter into the position before cutting- fixed the front head of steel strip –crane moving –adjusting the washer-cutting the front head of steel strip-crane moving –left and right platen fall off-welding –each part back to original position. 4 Horizontal accumulator: (diameter:5.5M) The function of this part is to storing a mount of steel strip to insure the machine working continuous when the steel strip on the shear and butt-welder. 5 Forming machine The function of this part is to make the steel strip become to the tube blank by forming rollers 6 Main driving system: Transmit the power to forming machine DC motor : 132KW×2 7 HF welding machine Welding the steel strip to tube Rectifier cabinet inverter output cabinet Air-Water cooling system 8 Cooling system Using water or emulsion to cooling the pipe so the temperature will be lower. 9 Sizing machine The function of this part is used to finishing the tube blank from the forming machine, so the tube size can meet the physical dimension customer required. 10 Computer cutting saw The function of this part is to cutting the length of finished tube as customer wanted, have the function of accumulative total for length and amount. 11 Run out table (About 10M) The function of this part is convey the finished tube, equipped with dynamic roll. Double side kick out the tube. | ||
Hope to be your faithful partner in the near future!! |
Packaging Detail:wood pallet,wooden case |
Delivery Detail:4 month |