ZG 114 high frequency welded pipe production line

1 Raw material: Carbon steel,Galvanized steel, 2 Round diameter: 50-127mm,1.5-5.0mm, 3 Square tube:40*40-100*100mm, 1.5-4.0mm - details see: https://www.machineto.com/zg-114-high-frequency-welded-pipe-production-line-10081935
Condition:NewType:Pipe Production LinePipe Material:Carbon SteelApplication:decoration,building ,furniture and so on
Production Capacity:15-60M/min according to different size and thicknessPlace of Origin:China (Mainland)Brand Name:NanyangModel Number:ZG114
Voltage:440V/50Hz,440V/60Hz,380V/50Hz,380V/60Hz and so onPower(W):About 850KW for whole lineDimension(L*W*H):85*9*2.8Weight:About 90Ton
Certification:CE ISO9001:2000Warranty:One yearAfter-sales Service Provided:Engineers available to service machinery overseasColor:General Green or Blue, we can also follow your idea
ZG 114 high frequency welded pipe production line
contact supplier for ZG 114 high frequency welded pipe production line


product name

ZG 114 high frequency welded pipe production line

Sales status

As a excellent welded pipe production line manufacturer in China ,we have about 30 year experience to design and producing it. Every year we sales about 300 production line , achieve the Famous brand of Jiangsu province. Good quality and high credibility is why we surviving and leading the market

Basic components

Uncoiler→Straightening end of strip→Powerful leveling machine→Shear and end welder→Horizontal-type accumulator→Main machine(Forming, welding, sizing)→Computer-controlled tracking cutting saw→Run-out table.

main technical

parameters

Round tube diameter

Φ50mm~Φ127mm

Round tube thickness

δ1.5mm~5.0mm

Square tube size

40×40~100×100mm

Square tube thickness

δ1.5mm~4.0mm

Rolling speed

15M/min~60M/min

Main brand of some parts

Bearing

HRB

HF welding machine

Red star or Sanyi

Main drive system

Heng li

Electric control system

Contor

Hydraulic elements

Yuken

Pneumatic elements

Airtac

Description

1 Uncoiler :

The function of this part is to separating the steel strip coil and become to the raw material to roll forming . The steel strip coil will be brought in to the below of the double-drill uncoiler, hydraulic cylinder support the steel strip coil to the centre of the double-drill uncoiler , double-drill uncoiler began moving to hold the steel strip coil, coil car fall off by hydraulic cylinder and go back.

2 Flattening and leveling machine

The function of this part is to separating the front head of steel strip on the uncoiler,also reversed bending the steel coil head to adjusting it’s character of inner curl. Steel strip will enter into the flattening machine by dynamic rubber roll. Flattening machine equipped with one set of pinch roll device and five roll leveling device ,there is one pairs centring device in front and behind.

3 Shearing and butt-welding machine

The function of this part is using hydraulic knife to cutting the irregular part in the front and end of the steel strip through the motor controlled by the human. Adjusting the size of the welding seam, translation hydraulic cylinder moving it to the welding position, two welding platen pressing it than moving the welding gun to the position of welding seam. Opening the motor ,welding and connecting two steel strip by using carbon dioxide arc welding ,polishing and flattening the welding seam by human, so the machine can working continuous. Shear and butt-welder is consist of :electric control operating table,hydraulic station,welding machine,pinch system,lathe bed system(lathe bed and washer adjusting device),centring system(steel strip end fixed and front head of steel strip translation device ),crane system,cutting system(cutting device and cutting platen) and welding system(welding tractor and welding platen). Working flow: end of the steel strip enter into the position before cutting –fixed the end of the steel strip-cutting the end of the steel stirp-front head of steel strip enter into the position before cutting- fixed the front head of steel strip –crane moving –adjusting the washer-cutting the front head of steel strip-crane moving –left and right platen fall off-welding –each part back to original position.

4 Horizontal accumulator: (diameter:5.5M)

The function of this part is to storing a mount of steel strip to insure the machine working continuous when the steel strip on the shear and butt-welder.

5 Forming machine

The function of this part is to make the steel strip become to the tube blank by forming rollers

6 Main driving system:

Transmit the power to forming machine

DC motor : 132KW×2

7 HF welding machine

Welding the steel strip to tube

Rectifier cabinet

inverter output cabinet Air-Water cooling system

8 Cooling system

Using water or emulsion to cooling the pipe so the temperature will be lower.

9 Sizing machine

The function of this part is used to finishing the tube blank from the forming machine, so the tube size can meet the physical dimension customer required.

10 Computer cutting saw

The function of this part is to cutting the length of finished tube as customer wanted, have the function of accumulative total for length and amount.

11 Run out table (About 10M)

The function of this part is convey the finished tube, equipped with dynamic roll. Double side kick out the tube.

Hope to be your faithful partner in the near future!!

ZG 114 high frequency welded pipe production line
Packaging Detail:wood pallet,wooden case
Delivery Detail:4 month

Related Product for ZG 114 high frequency welded pipe production line