Z Shape Purlin Forming Machine
Z Shape Purlin Forming Machine, Machine with CE certificate - details see: https://www.machineto.com/z-shape-purlin-forming-machine-10088510
Type:Steel Frame & Purlin Machine | Condition:New | Work Pressure:8-12Mpa | Production Capacity:6-8m/min |
Place of Origin:Zhejiang China (Mainland) | Brand Name:Zhongyuan | Model Number:zyyx | Voltage:380V/50HZ/3Phase |
Power(W):20.5KW | Dimension(L*W*H):9.5m x 1.7m x 1.4m | Weight:9.5tons | Certification:BV & SGS |
Warranty:1 year | After-sales Service Provided:Engineers available to service machinery overseas | Rollers Material:Cr12 Mould Steel with quenched treatment | Shafts Material:High grade No.45 carbon wrought steel |
Cutting Blade:Cr12 mould steel with quenched treatment | Electric Elements:Mitsubishi PLC and Transducerr | Working display:guiding-levelling--roll forming-punching-cutting |
Z Shape Purlin Forming Machine
1.Technical parameter:
Item | Specification | |
Material | Type | Galvanized coils |
Thickness | 1.5-3mm | |
Yield strength | 235Mpa | |
Roller material | Cr12 mould steel | |
Forming speed | 10-15m/min | |
Output speed | 6-8m/min | |
Speed adjusting mode | AC Frequency | |
Roller drive | Decelerating motor + Chain drive | |
Cutting mode | Hydraulic cutting | |
Cutter material | Cr12 mould steel | |
Length measurement | Encoder | |
Control mode | Mitsubishi PLC | |
Operating mode | Button + Mitsubishi Touch screen | |
Main motor power(kw) | 15KW | |
Total power(kw) | 20.5KW |
2. Main parts of machine:
Decoiler | 1set |
Feeding & guiding device | 1set |
Leveling device | 1 set |
Punching device | Depend on final design |
Main roll forming machine | 1set |
Hydraulic cutting system | 1set |
Controlling system | 1set |
Run out table | 1set |
3. Working folw:
Decoiler--Feeding & Guiding--Leveling--Punching--Roll forming--Hydraulic cutting--Products to run out table
Packaging Detail:1. One 40ft container for one machine with mechanical decoiler; 2. Main machine body and decoiler is load naked (tighten to container with steel wire rope);3. PLC cabinet be packaged by protective film.4. Some spare parts and tools are loading in tooling box. |
Delivery Detail:60 days after receipt of advanced payment |