XLB series PLC control plate curing press
plate curing press, 1.high speed, in/out mold, 2.PLC control,easy operation, 3.no oil leakage, high efficiency, 4:CE and ISO - details see: https://www.machineto.com/xlb-series-plc-control-plate-curing-press-10267013
Place of Origin:Shandong China (Mainland) | Brand Name:Qingdao Guangyue | Model Number:XLB series | advantage:no leakage of oil |
structure:frame type | heating way:oil/steam/ electricity | control system:PLC | Type:pillar type or frame type |
other:equipped with a mould push out device |
XLB-Series Rubber Curing Press
1.Main uses
The Curing Press mainly works for the clampdown of rubber ,which can be used as normal hydraulic machine.
We have bothcolumn and framestructure .
2.Advantages:
1 Simple and convenient structure ,flexible operation,commodious space.The cylinder and plunger are made up of high –quality materials.
2Hydraulic station and electric cabinet areLocated in both sides of the main engine.
3 Conveniently operated.
4 Without oil spilling or off pressure.
5.Excellent reputation .
6 CE Standards
3. Technical Parameter as follows:
Parameters/version | XLB350*350*2 | XLB400*400*2 | XLB500*500*2 | XLB600*600*2/4 | XLB750*850*2 | XLB1000*1000*2 |
Mould closing force | 0.25 | 0.5 | 0.8 | 1.0 | 1.6 | 2.5 |
Hot plate spacing | 125 | 125 | 125 | 125 | 125 | 200 |
Hot plate layer | 2 | 2 | 2 | 2/4 | 2 | 2 |
Plunger stroke | 250 | 250 | 250 | 250/500 | 250 | 400 |
Heating way | Electricity/stream | Electricity/stream | Electricity/stream | Electricity/stream | Electricity/Stream | Electricity/stream |
Main motor power | 2.2 | 2.2 | 2.2 | 2.2 | 3 | 5.5 |
The thermal power | 2.4kw/board | 3kw/board | 3 | 7.5kw/board | 9kw/board | 10.8kw/board |
Size(l*w*h) | 1450*400*1350 | 1600*400*1440 | 1450*690*1818 | 1880*780*1660 | 2100*1010*1900 | 2400*960*2500 |
Weight(kg) | 1200 | 1500 | 1700 | 2500/3100 | 3560/4300 | 8300 |
Platen unit area pressure | 2.04 | 3.13 | 2.52 | 2.78 | 2.51 | 2.5 |
Packaging Detail:standard packing or customer request |
Delivery Detail:25 days after deposit |