wood shavings machine for sale
Condition:New | Application:make wood shavings | Production Capacity:3 t/h | Place of Origin:Henan China (Mainland) |
Brand Name:Allance | Model Number:ALC0-wood shaving machinery | Voltage:3 phase | Power(W):42.87kw |
Dimension(L*W*H):515*115*180cm | Weight:2850kg,light | Certification:TUV | Warranty:1 year |
After-sales Service Provided:Engineers available to service machinery overseas | material:iron/stainless steel | color:green | output:1000-3000kg/h wood shaving machinery |
usage:make wood shavings | name:wood shaving machinery | supply:longterm and stability | sale:hot |
operation:easy and safe | performance:world wood shaving machinery |
As a professional manufacturer and exporter, we also have cooperation with all Chinese factories, and we are currently exporting over 90% of our products worldwide with high quality and best price.
wood shavings machine for sale :
1. China electricwood shaving machineryis mainly used to make thin shavings from thickness wood or waste wood.
2. This wood shaving machineryincludes frame, platform on the frame, knife fixed on the platform, wood timber is sent into the machine from inlet.
3. The wood shavings made by this wood shaving machineryhas uniform size and thickness, has no difference from manual, also the thickness can be adjusted.
Function ofwood shavingmachinery.
Wood shavings can be used as material of particleboard and paper pulp in paper mill, it can also used as bed for animals.
Technical parameters of wood shavings machine for sale.
Model | ALC0-WSM500 | ALC0-WSM600 | ALC0-WSM800 | ALC0-DURA |
Cutter diameter(mm) | 450 | 550 | 750 | / |
Blade quantity | 8 | 8 | 8 | / |
Input diameter(mm) | 180x200 | 180×200 | 200×200 | / |
Spindle speed(mim/h) | 740 | 740 | 740 | / |
Equipped power(k w) | 7.5 | 15 | 30 | 37 |
Output(kg/h) | 200-300 | 500-800 | 1000 | 1000-3000 |
Pls select wood shaving machine according to your ideal capacity, any inquiry will be replied within 24 hours.
Packaging Detail:Export Standard Packing |
Delivery Detail:within 10-15 days after confirming the down payment |