Wire shelving whole plant welding machine
Type:Other | Place of Origin:Hubei China (Mainland) | Brand Name:juntengfa HORSE | Voltage:380v |
Usage:mesh welding,spot&projection welding | Certification:CCC,CE | After-sales Service Provided:Engineers available to service machinery overseas | Welding Wldth:1200-2600 |
Number of cyliders:8-16Pc | Warranty:one year | Rated Capacity:DNW1200-2600/** |
Wire shelving whole plant welding machine
Description:
in this modern society ,metal mesh is widely applied ,at express way ,sport fields ,golf ,park ,villa ,farm ,etc ,our metal mesh welder applies microcomputer controlling technology by Mitsubishi PLC ,it can weld 50 points at the same time the whole processing progress including feeding welding ,cutting ,and flatting can be finished automatically.
Metal mesh :can be used on fence welding of high way ,railway ,tennis court , palestra ,farm ,etc .
Hardware :can be used on welding of all kinds of electroplate ,paint shelf ,exhibition shelf ,barbecue mesh ,etc,
Storage shelf :can be used on shelf welding of heavy goods shelf ,warehouse cage ,shopping cart ,etc.
Choosing the equipments according to customer’s requirements:
(1).Manual feeding equipment.(Manually place the work piece ,and feed it to the welding station ,start the welding machine to weld the work piece in a row ,then push it to the next station until finish the whole work piece ,this type is with low cost and high work intensity.)
(2).semiautomatic feeding equipment.(Manually place the work piece ,automatically feed it to the welding station ,and weld work piece in a row ,then automatically push it to the next station until finish the whole work piece ,the finished parts will return automatically ,or return from back,this type can improve the productivity ,reduce the work intensity and improve the quality.)
(3).Automatic double-molds feeding equipment.(the use of advanced PLC and flexible man-machine interface controlling and the precise servo motor driving system makes it available on continuous automatically feeding and welding,It is with front and back two layers table ,so when one layer table is in welding work ,the other can be used to place the work piece ,then change the work after welding ,it effectively improve the work efficiency ,and also it can weld the different specification of metal mesh conveniently through adjusting the man-machine interface.
MODEL NO | Welding width | Number of cylinders(pc) | |||||||||
DNW1200/** | 1200 | 8 | 10 | 12 | |||||||
DNW1600/** | 1600 | 8 | 10 | 12 | 14 | 16 | |||||
DNW2200/** | 2200 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | |||
DNW2600/** | 2600 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 | 26 |
Remark: "**"smeans welding cylinder number; for example: DNW1200/ usd 8 pcs cylinders, noted as DNW1200/08.
Packaging Detail:Standard export packaging |
Delivery Detail:30 days |