Wheat storage Steel silos ,assembly corrugated galvanizing steel silo
Condition:New | Capacity:3794 | Material:Steel | Place of Origin:Shandong China (Mainland) |
Brand Name:SHELLEY | Model Number:TCK14619 | Dimension(L*W*H):14.6*14.6*24.74m | Weight:40 t |
Type:flat-bottom | Made of:Corrugated steel sheet | Plate thickness:3mm | Equipped with:silo door |
Model : TCK14619
Diameter : 14.617m
Layer : 19
Volume : 5449 m3
Capacity : 4086t
Eave height : 16.87 m
Total height : 22.13m
SILOS :
- Commercial Type (Flat Bottom) Steel Silos with capacity from 100 tone to 10.000 tone
- Conical Type (Hopper Bottom) Steel Silos with capacity from 10 tone to 1.000 tone
Silos includes level sensors,aeration system with centrifugal fan,temperature control system and sweep auger as an option.
CARRYING EQUIPMENTS :
- Bucket Elevator with capacity from 1 tone/hour to 400 tone/hour
- Chain Conveyor with capacity from 1 tone/hour to 400 tone/hour
- Screw Conveyor with capacity from 1 tone/hour to 200 tone/hour
- Elevator Towers
- Electrical and Manuel controlled Slide gates
- Distrubutors with 1 in 2/3/4/5/6 out
- Catwalks
- Spout Pipes
MACHINES :
- Drying Machines ( Tower Type and Horizontal Type ) with capacity from 5 tone/hour to 50 tone/hour
- Mill Machines with capacity from 5 tone/hour to 50 tone/hour
- Pellet Machines with capacity from 5 tone/hour to 50 tone/hour
Ⅲ. Operating Regulations
1. Strictly prohibit loading and discharging materials in a leaning side ways.
Correct Operating Schedule:
A: Discharge the materials from the center discharge hole first until no grain can flow out of the hole.
B: Open the two sideward discharging holes concurrently with a charging speed ≤100T/h capacity.
2. Requirement for loading at original operation: Initially loading 60% volume and two months the remaining 40%.
3. Opening the gate when the grain is above it’s height is strictly prohibited. This would result in the material exploding out and the silo collapsing which can cause injury or death.
4. Strictly prohibit workers from staying in the silo when loading, discharging or breaking the grain block.
5. Close the gate, manhole and ventilator scoop after maintenance, to protect it’s contents from the weather and avoid spillage.
6. Ensure that trained professional worker to have the silos and auxiliaries parts maintained periodically according to the instruction.
7. If the zinc or painted parts are rusted, please take measures timely. The usual method is: descaling→brushing antirusting paint two times→brush surface paint two times. Generally, the paint parts should be painted every two years. Silver paint should be painted every three years in littoral area and every six years in inland area.
8. Ventilate and invert running (putting the grain in silo out and passing the inverting running conveyors and back to the silo again) timely when the grain temperature or if the moisture is high.
9. Strictly prohibit starting the machine when someone is maintaining it.
10. Keep off the silo during bad weather to prevent lightning injury.
11. Connect the column with the lightning net on the embedded part to prevent the silo body from lighting danger.
Main Features:It is popular with its simple structure, large capacity, various ways of unloading. Further more flat bottom steel silos can be easily maintained.
Flat bottomed steel silos are with large diameter and capacity, which is popular for its easy installation and lower costs. There are many ways for unloading, such as the free-fluidized unloading, multi-spot unloading, the flat bottom sweeping unloading and clean by hands etc... We can also choose the concrete conical bottom to put the automatic-flow unloading into practice. The flat-bottom steel silos can be widely used in grain process and storage lines, some of them can be chosen to be used in oil, feed, flour, starch, brew, and port or grain storage industrial lines.
Flat-bottom silos: Volume:39m3-13873m3
Capacity:30t-10682t
Diameter:3.6m-20.1m
We can supply the accessory equipment of the steel silos.
Accessory equipment:
* Handling equipment
Elevator
Conveyor
* Preclean
* Ventilation system
* Dedust system
we supply soils fundation design/ construction, soils installation and client can rely on our preferct after-sale service.
Packaging Detail:WOOD BOX OR PAPER BOX |
Delivery Detail:30 DAYS |