Wet Back Three Pass Steam Boiler

Scotch type three pass steam boilers. Solid-gas or oil fired. Complete with all accessories - details see: https://www.machineto.com/wet-back-three-pass-steam-boiler-10211898
Condition:NewType:Natural CirculationUsage:IndustrialStructure:Fire Tube
Pressure:High PressureStyle:HorizontalFuel:Oil / GasPlace of Origin:Konya Turkey
Brand Name:AkkayaModel Number:SBKOutput:SteamAfter-sales Service Provided:Engineers available to service machinery overseas
Certification:PED 97/23 - ISO 9001-2000   
Wet Back Three Pass Steam Boiler
contact supplier for Wet Back Three Pass Steam Boiler


1- For its efficiency and reliability these types of boilers are widely used in industry. The exhaust
gases pass three times inside these boilers. The exit temperature of the exhaust gases are less than two pass types boilers. The heating surface area is big enough to reach efficient and safe operation.
2-Net heat transfer area inofrmation of the boilers are given to the customers.
3- Our boilers are CE certificated and constructed according to PED 97/23 EC directive.
4- Our company has ISO9001 quality management system certificate
5- Certifacated tubes and steels are used.
6- Boilers are insulated with min. 100 mm thick rockwool.
7- Tubes are roller expanded and then welded to the min. 15 mm thick mirror plates to prevent crackings.
8- For high pressure types combustion chambers are manufactured as corrugated type to provide higher strength and to overcome thermal expansion problems.
9- Upon request our boilers are supplied fully assembled with armatures and necessary equipments including deaorator, economisor and recuparator.
10- High quality and well known marks are used for armatures. All packaged boilers have furnace overheat alarm system.
11- Special refractories can be applied for oil and solid fired boilers.
12- Welding are controlled according to EN 12953 & PED97/23 requests by ultrasonic testing method. Tests are carried by EN473 & ASNT certificated personal.
13- It is easy to reach and clean the fire tubes of the boilers.
14- Welding are done according to approved WPS's and WPQR's.
15- Our welder are certificated according to EN 287. The welders are controlled by EN 719 certificated welding supervisor.
16- Rear smoke box are easy to disassemble to allow maintanence and cleaning.

Wet Back Three Pass Steam Boiler
Packaging Detail:wooden casing or plastic cover according to the size of the boiler and delivery conditions
Delivery Detail:4-16 weeks according to required capacity and quantity

Related Product for Wet Back Three Pass Steam Boiler