W:CD-160 Full automatic single pcs packing wet wipes machine
(1)Suitable to produce single piece wet tissue, (2)Automatic wetting and recycle system, (3)folding,wetting and packing - details see: https://www.machineto.com/w-cd-160-full-automatic-single-pcs-packing-wet-wipes-machine-10326778
Condition:New | Place of Origin:Fujian China (Mainland) | Brand Name:chuangda | Model Number:CD-160 |
Voltage:380V 50HZ | Power(W):6KW | Dimension(L*W*H):4500*1000*1600mm | Weight:1500kg |
Certification:CE | Warranty:within one year | After-sales Service Provided:Engineers available to service machinery overseas | Material:Stainless steel |
Color:Silver | Finished tissue:1-2 pcs/pack | Produce process:Folding,wetting and cutting | Production:Wet tissue |
After service:Good after service |
CD-160 Full automatic single pcs packing wet wipes machine
CD-160 Full automatic single piece wet wipe machine is full automatic to put parent roll through putting volumes, and longitudinal fold, adding liquid and cut, horizontal folded in half, and final film package, sealing, positioning and cutting .All process finish on the machine. Without human touching, the production is hygienic, and speed is fast.
1.Main technical parameter:(Suitable to produce single piece wet wipes)
Electrical source | 380V 50HZ |
Production speed | 6KW |
Production speed | 80~150 packs/min |
Product size (unfolded) | (120~260)×(150~200) mm (L×W) |
Product size (folded) | (60~130)×(50~80) mm (L×W) |
Control system | PLC control system,Color touching screen |
Suitable Materials | Spunlace non-woven fabric |
GSM of raw material | 40~80 g/m² |
Size of raw material | (150~200)×1000 mm (W×D) |
Weight of machine | 1500 kg |
Machine size | 4500×1000×1600 mm (L×W×H) |
2.Making Option:
a.Folding way: “ Z ” folded to two folded of three folded.
b.Full servo motor.
3.Finished Production
Packaging Detail:By exporting standard protective measures. Such packing shall be suitable for long distance ocean and /or air, and inland transportation and well protected against dampness, moisture, shock, rust and rough handling so as to ensure that the goods will safely arrive at the erection or construction site without any damage |
Delivery Detail:40 days after we get your advance payment |