used oil diatillation recycling machinery with CE/ISO
Condition:New | Place of Origin:Henan China (Mainland) | Brand Name:Deast Hpeace | Model Number:JL-2 |
Usage:recycling used oil machinery | Power(W):20kw | Dimension(L*W*H):2200*5100mm | Certification:CE/ISO |
After-sales Service Provided:Engineers available to service machinery overseas | OIL:Vacuum Oil Purifier | SHAPE:columnar | size:2200mm*5100mm |
diameter:2200mm | capacity:10 tons per BATCH | the certificate:ISO9001/14001/CE | power in total:20 KW |
Equipment type | JL-1 type | JL-2 type |
Raw material | Raw oil Waste engine oil Waste plastic oil Waste rubber oil | Raw oil Waste engine oil Waste plastic oil Waste rubber oil |
Structural form | Vertical band tower | Vertical band tower |
24-hour disposal amount (no less than) | 6 tons raw material | 10 tons raw material |
Working form | Intermittent operation | Intermittent operation |
Operating pressure | Normal/ Negative pressure | Normal /Negative pressure |
Oil yield (No less than) | 70%-80% | 70%-80% |
Power | 20.0kw | 20.0kw |
Mode of cooling | Water cooling | Water cooling |
Consumption of cooling water (T/h) | 9 | 9 |
Heating mode | Hot air | Hot air |
Mounting means | Having base | Having base |
Noise dB(A) | ≤85 | ≤85 |
Production period | 20 days | 20 days |
1.Safety:
Unique technology for 100% guarantee of no fire and explosion accident besides normal measurement for safety such as safety valve, alarm system, etc.
2.Technology:
We have already obtained the international PCT(Patent Cooperation Treaty) with application number of PCT/CN2010/080573 for Continuous Pyrolysis Method.
3. Heating method: adopt the latest heating method---take the advantages of both direct heating and indirect heating which brings the following profits:
3.1 Fuel: it saves 20% fuel. Take coal for example, we will save around 100KGS per day. It means you can save 20 USD per day
3.2 Depreciation: We only need to change the front part of the reactor by using this heating method. It will cost us around USD20000.00 for changing the whole reactor, while it will only cost us around USD4000.00 for changing the front part of the reactor.
3.Quality: Besides the normal quality control measurement, we make every part of the machine with special process card which is designed exactly and strictly according to the ISO14001/9001
4.Service: we have a professional service staff especially responsible for your running plant besides our sales manager and the technician.
Packaging Detail:2*40HC containers for all accesories |
Delivery Detail:20--25 days after get depoist |