Used in carbon charcoal briquette carbonization furnace
Condition:New | Type:Spontaneous Combustion,Used in carbon charcoal briquette carbonization furnace | Application:charcoal | Place of Origin:Henan China (Mainland) |
Brand Name:Allance | Model Number:ALC11-THL8 | Effective Volume:8 cube | Dimension(L*W*H):4.5*2.2*2.2m |
Weight:7500kg | Power(W):4kw | Capacity:2.5-3.5t | Time of cooling:20h |
Time of carbonization:6-8h | Warranty period:1 year | Used in carbon carbonization furnace:color as you like |
Used in carbon charcoal briquette carbonization furnace
1.Safe&save energy
2.High efficiency&easy operation
3.Smokeless&non-poisonous
4.Used in carbon charcoal briquette carbonization furnaceInformation of Used in carbon charcoal briquette carbonization furnace
1.Used in carbon charcoal briquette carbonization furnace, open the door of carbonization furnace and raw material put in it.
If raw material is log ,firstly,we need to remember these number:0 rise to200 rising 350 up to 480 drop to 80 centigrade, this is temperature of temperature controller.different change of temperature,we need to make change for carbonization furnace.
2.Close door and open the four outlet flue, and cover the furnace, along the roof of which lay some fine sand for insulation, and begin the process of carbonization.
3.When the furnace is cool down(drop to 80 centigrade), open the door of carbonization furnace,and we are finished the processing.
Used in carbon charcoal briquette carbonization furnace parameter
Model | Power (kw) | Capacity(t) | Packing size(m) | Weight(kg) |
ALC11-THL3 | 4 | 1-1.5 | 2.32*1.61*2.2 | 3500 |
ALC11-THL5 | 4 | 1.5-2.5 | 3.3*2.2*2.2 | 5500 |
ALC11-THL8 | 4 | 2.5-3.5 | 4.5*2.2*2.2 | 7500 |
Used in carbon charcoal briquette carbonization furnace
Used in carbon charcoal briquette carbonization furnace, production line(crusher.dryer. charcoal briquette machine and conveyor belt.etc)
Any question ,pls contact christina
Used in carbon charcoal briquette carbonization furnace
Packaging Detail:wooden case |
Delivery Detail:12 days after get your prepayment |