TY C10/840 double layer roll forming mahcine
Condition:New | Type:Tile Forming Machine,C10/840 double layer roll fomring mahcine | Tile Type:Colored Steel | Use:roof and wall |
Production Capacity:10-12m/min | Place of Origin:Hebei China (Mainland) | Brand Name:Tianyu | Model Number:C10/840 double layer roll forming machine |
Power(W):3kw | Voltage:380V,50HZ,3phase | Dimension(L*W*H):6.5*1.3*1.4m | Weight:3.4T or so |
Certification:CE&ISO | Warranty:12 month warranty | After-sales Service Provided:Engineers available to service machinery overseas | Machine size:6500*1300*1400mm |
Material thickness:0.2-0.8mm | Control system:PLC | Thickness of middle plate:14mm | Diameter of principal axis:70mm |
Hydraulic station power:3KW | OEM:Yes | Roller station:840-13 rollers,C10-13 rollers | Main motor power:3KW with Cycloidal reducer |
Welcome to Botou Tianyu Roll Forming Machine Factory!
Our factory was founded in 1996, specializing in making all kinds of roll forming machine, and if you have special requirements, we could customize the machine just for you!
1.TY C10/840 double layer roll forming mahcine
2. Components of the roof making machine
1. Uncoiler | 1 set |
2. Feeding platform | 1 set |
3. Molding machine | 1 set |
4. Cutting device | 1 set |
5. PLC control system | 1 set |
6. Hydraulic station | 1 set |
7. Output supporter | 1 set |
3. Advantages of the roof making machine
advantage of the machine | 1. Low noise 2. Stable 3. Easy to control |
advantage of the tiles | 1. High strength 2. Durable 3. Elegant 4. Easy to install |
4. Work flow
5. The general technical parameters
1 | Machine size | 6.5*1.5*1.4m |
2 | Weight | about 3.3t |
3 | Roller station | C10-13 rollers; 840-13 rollers |
4 | Main frame | 300 H-beam |
5 | Vertical plate | 14mm |
6 | Productivity | 10-12m/min |
7 | Feeding width | 840-1000mm; C10-1250mm |
8 | Feeding thickness | 0.2-0.8mm |
9 | Diameter of the shaft | 70mm |
10 | Control system | PLC |
11 | Voltage | 380V,50HZ,3 phase |
12 | Motor power+hydraulic station | 3KW+3KW |
13 | Chain | 1.3 inch |
14 | Error range of the length | 1mm-2mm |
6. Materials
Roller material | High quality 45# forged steel plated with 0.05mm chrome |
Shaft material | High quality 45# carbon wrought steel at diameter 70mm |
Cutter materail | Cr12 mould steel with quenched treatment |
7. Process
* The process of roll forming is one of the simpler manufacturing processes.
1. It typically begins with a large coil of sheet metal, between 1 in. and 20in. in width, and 0.004 in. and 0.125 in. thick, supported on an uncoiler.
2. The strip is fed through an entry guide to properly align the material as it passes through the rolls of the mill, each set of rolls forming a bend until the material reaches its desired shape.
3. Roll sets are typically mounted one over the other on a pair of horizontal parallel shafts supported by a stand(s).
4. Side rolls and cluster rolls may also be used to provide greater precision and flexibility and to limit stresses on the material.
5. The shaped strips can be cut tou length ahead of a roll forming mill, between mills, or at the end of the roll forming line.
8. Production rate of the roof making machine
*The production rate depends greatly on the material thickness and the bend radius, it is also affected by the number of stations or steps required.
*For bend radii of 50 times the material thickness of a low carbon steel .07 in thick can range from 85 feet per minute through eight stations to 55 feet per minute through 12 stations or 50 feet per minute through 22 stations.
*The time taken for one product to take shape can be represented by a simple function.
*The function is as follows: Forming time=[ L+n(d)]/V
where V is the velocity of strip through rolls (fpm), L is the length of the piece being rolled (ft), d is the distance between forming stands (ft), and n is the number of forming stands.
*In general roll forming lines can run from 5 feet per minute to 500 + depending on the application.
*In some cases the limiting factor is the punching or cutoff applications.
9.Packing
1. Tighten to container with steel wire rope and welded machine with container by angel iron
2. Main forming machine and un-coiler is naked(If you need we can also packed with water-proof plastic)
3. PLC contral system and motor pump are packed with water proof paper coverage
10.MOQ
One set,more orders,more discount.
11.Payment
T/T(30% by T/T in advance,the rest 70% to be payed by T/T after you inspect the machine in seller's factory before delivery)
12.Delivery Time
20-35 days after we get the advanced 30 % payment
Believe and choose us, Believe your choice!
Welcome to Tianyu, Welcome to China!
Packaging Detail:1. Tighten to container with steel wire rope and welded machine with container by angel iron 2. Main forming machine and un-coiler is naked(If you need we can also packed with water-proof plastic) 3. PLC contral system and motor pump are packed with water proof paper coverage |
Delivery Detail:20-30 days after getting 30% deposit |