tungsten grinding machine used in tig welding
Place of Origin:Henan China (Mainland) | Brand Name:Zzkehui | Model Number:KH | Certification:ISO9001 |
Main color:blue | Advantages:Highest angle accuracy,Transportable,Non-stop action possible | Your benefits:Perfect preparation for orbital as well as hand welding | Machine weight approx:1.8kg |
Power:400w | Power-on time:100% | voltage:220V |
Tungsten grinding machine
In TIG argon arc welding, plasma welding etc need to use tungsten pole occasions, generally need grinding tungsten pole, But tungsten pole grinding of dust on person body produce very harmful, and because of tungsten pole Angle and tungsten pole surface roughness etc factors affecting the quality of welding. In automatic welding occasions, in order to achieve the welding quality consistency, normally required tungsten pole shape and surface roughness and can't change, but artificially grinding quality is uneven, so use tungsten pole grinding machine grinding out quality uniformity of tungsten extremely high quality is very necessary.
Performance characteristics
1, use high quality micro motors with high reliability.
2, exquisite structure design, get rid of the grinding process tungsten pole radioactive dust the harm to human body.
3, Angle precise, surface high precision. To improve the welding arc quality provide basic guarantee.
4, like a flashlight size, operation is convenient and simple.
5, scope of work: grinding of tungsten pole has 1.0, 1.6, 2.0, 2.4 and 3.2, 4.0, 4.8, 6.0 mm.
Can grinding Angle has 10, 20, 40 to 50, 30, 60, 70 and in these angles between arbitraryAngle are grinding
Advantages:
Highest angle accuracy
Transportable
Non-stop action possible
Ergonomic design
Your benefits:
Perfect preparation for orbital as well as automatic
High flexibility
High productivity
Less energy-consuming
No tool change
Technical data
Weight Probably 1.8 kg
Power 400W
power source 220V,50Hz
Packaging Detail:Usually in carton packing, can do special packing as client's request.It can cause extra expense. |
Delivery Detail:15-30 working days after receiving 30% deposit |