Track Link Ass'y for Bulldozer
Place of Origin:Liaoning China (Mainland) | Brand Name:NIS | Model Number:KOMATSU,HITACHI,KOBELCO,HYUNDAI,SHANTUI | Condition:New |
Moving Type:Crawler Bulldozer | Process Technology:Forging | Color:Black/Yellow/Gray | Warranty:One Year/1500-2000 hours |
Model:TY220,TY230,T120,T140,T160,D60,D65,TY160,TH100,T120,T140,T160,D6C,D6H |
Undercarriage Parts including:
Track shoes, Pin, Sprocket, Bottom roller, Top roller, Idler,Track chain and so on.
Suitable for Brands:
IHI, KOMATSU, HITACHI, KOBELCO, KATO, SUMITOMO, SANY, ZOOMLION, LOVOL,FUWA,DEMAG, MANITOWOC, NISSHA,XCMG and so forth brands.
Track Link Ass'y for Bulldozer :
Main Products:
1.Crawler Crane, Excavator and BulldozerUndercarriage parts:
Track chain, Track shoe, Sprocket& Segment, Idler, Track roller, Carrier roller
2. Ground Engaging Tools:
Excavator Bucket, Bucket Tooth & Adapter, Cuuting Edge...
3. Rubber trackfor Excavator ,Dumper and Agricultural Machinery
Related parts Photos:
Track roller:
Sprocket:
Top roller:
Idler:
Track shoe:
Track chain &Track shoe assy:
Swamp shoe:
Rubber track:
Excavator Bucket:
Bucket tooh and adaptor:
Suitable for Model:
CAT | |||||
CAT200B | CAT240B | CAT305 | CAT315 | CAT320 | CAT325 |
CAT330 | CAT345 | CAT350 | CAT312 | CAT365 | |
KOMATSU | |||||
PC55 | PC60 | PC100 | PC130 | PC200 | PC210 |
PC220 | PC240 | PC270 | PC300 | PC360 | PC400 |
PC450 | PC1000 | PC1250 | |||
KOBELCO | |||||
SK55 | SK60 | SK100 | SK120 | SK200 | SK210 |
SK220 | SK250 | SK260 | SK300 | SK330 | SK350 |
HITACHI | |||||
EX60 | EX100 | EX120 | EX200 | EX210 | EX220 |
EX270 | EX300 | EX330 | EX400 | ZX35 | ZX60 |
ZX100 | ZX120 | ZX200 | ZX210 | ||
HYUNDAI | |||||
R55-R505 | |||||
DOOSAN | |||||
DH35-DH500 | |||||
VOLVE | |||||
EC55-EC700 | |||||
SANY | |||||
SY65-SY750 | |||||
LIUGONG | |||||
906 | 225 | 856 | |||
LOVEL | |||||
FR35-FR510 |
Our factory:
Contact Way:
Attn: Linda Yan
TEL:86-535-6724921
FAX:86-535-6724922
SKYPE:sale.linda
Packaging Detail:Standard Package: Pallet/ Wooden Case |
Delivery Detail:Within 15-20 days after receiving formal order |