three phase electricity energy power saver 100KW,industrial energy power saver
Place of Origin:Guangdong China (Mainland) | Brand Name:HG or OEM brand | Model Number:PS2011 | material::Stainless Iron housing |
Rated voltage::100V~415V AC | Rated frequency::50HZ~60HZ | Loading::75KW/85KW/120KW/200KW/300KW/400KW/500W/600KW/700KW/800kw/900KW |
three phase electricity energy power saver 100KW,industrial energy power saver
Main features and functions
The products is suitable for industry, commercial area,shop,super market,bar,hotel or the place with three phase power supply
1. no direct connection with apparatus
2. automatic electric compensation
3. double electric insulation
4. durable and reliable electric component used
5. stainless iron cover
6. With LED Screen to show the current
Principle and Virtue
- The fundamental principle of power compensation is the parallel connection of a capacitive power loading device and an inductive power loading device in the electric circuit, whenever the capacitive load discharges, the other part, inductive load would be charged and vice versa. Energy is interchanged between them. Part of energy charged to the inductive power-loading device is compensated by the energy discharged from the capacitive power-loading device.
- Instant compensation particularly refers the compensation made to the end point electric apparatus. Installation of the device would be at the power source near the apparatus in the circuit. The device is low-cost, small in size, highly effective and can be installed easily. It would be essential to implementation of power saving.
- Feature: local balance current;
- Improve the quality of power supply provided to the end point electric apparatus
- Lift the effectiveness of power usage and reduce the amount lost.
Rated voltage: 100V~415V AC
Rated frequency: 50HZ~60HZ
Loading: 75KW/85KW/120KW/200KW/250KW/300KW/400KW/450KW/500KW/600KW/700KW/800KW/900KW for choose
Temperature: -50~ 60°C
Stainless iron housing
With high quality PCB and thermostat,if over loading or over temperature,will stop work,when loading or temperature come to normal,will start work automatically. more safty.
Packaging Detail:norma packing or OEM Packing |
Delivery Detail:3days |