Supply Vibratory Hammer Pile Driving

pile driving, extracting and drilling, guardrail installation and maintenance, solar installation, timely service, low price - details see: https://www.machineto.com/supply-vibratory-hammer-pile-driving-10113536
Condition:NewEfficiency:HighPiling Speed(m/min):1-2 m/min.Place of Origin:Jiangsu China (Mainland)
Brand Name:ROADSKYModel Number:YZ230Weight:2500 kgDimension(L*W*H):4000*2200*3600 mm
Certification:ISO 9001:2000After-sales Service Provided:Engineers available to service machinery overseas  
Supply Vibratory Hammer Pile Driving
contact supplier for Supply Vibratory Hammer Pile Driving


1. Functions

1.1 Pile Driving Function: YZ230 Hydraulic Guardrail Pile Driver and Extractor and Driller is a designed to install and maintain the highway anti-collision guard rails and solar posts, especially be applicable for driving the guardrail post in newly constructing highways. It is also used for the photovoltaic installation, solar cells and solar panels installation.

1.2 Pile Extracting Function: With the same hydraulic system for extracting poorly driven or incorrectly positioned posts or road maintenance work, it is a professional machine for extracting the posts out of any conditions of ground.

1.3 Pile Drilling Function: This equipment can drill the holes on the concrete road, rock, granite and other very hard road conditions, then install the posts into the holes easily.

2. Features

2.1 YZ230 Hydraulic Guardrail Pile Driver and Extractor and Driller is composed of chassis, upper column, press arm, hydraulic system, hydraulic hammer, diesel engine, electric system, cooling system, control system, pile extracting equipment and pile drilling equipment. It has the characters of quick and exact positioning, compact size, lightweight, self-propelled, quick moving, humanized design, easy operation, high efficiency, low price.

2.2 The upper column is articulated with the main column. When you use a tow truck or trailer to tow the machine to the working site by the towing device with high speed, first you need to lay down the upper column by articulate and disassemble the traveling roller chain. The up and down, longitudinal and transverse shift, horizontal slide of the column are realized through hydraulic system.

2.3 The hydraulic hammer or pile drilling equipment is installed at the front end of the press arm. The press arm carries the hammer or pile drilling equipment downward and upward along the track of the column for pile driving or drilling working by hydraulic system. You can not use the upward force of the hammer to extract the posts out of the ground directly or it may damage your machine, we suggest you to choose our professional Pile Extractor for extracting the posts out of any kind of ground.

2.4 It has very famous brand diesel engine Changchai with electrical starting equipped, which has a stable performance, simple operation and maintenance and very long service life.

2.5 The control system is equipped with multiple directional control valve and centralized hydraulic control rods which makes the operation simple and convenient.

2.6 It can install piles up to 3m (9.84’) in length, but on request the machine can be supplied with extension columns which can install piles up to 3.5m (11.48’) or even 4m (13.12’) long.

2.7 The pile drilling equipment adopts hydraulic system and wind-driven principle, matched with air compressor, the drilling equipment is formed of hydraulic motor, connecting device, connecting rod, pneumatic percussion hammer and drill bit. The motor is hydraulic operated, the driller is operated by compressed air.

2.8 The pile driving equipment, pile extracting equipment and pile drilling equipment share one chassis, is the most economical investment for getting the three functions. You can install any equipment onto the chassis according to your working need.

3. Main Technical Specifications

Overall Parameters

TypeYZ230
Rated Power24 KW
Wheel Track1670 mm
Hydraulic System Pressure16 MPa
Hydraulic System Flow50-55 L/min.
Traveling Speed0-15 km/h
Tow SpeedAround 60 km/h

Hydraulic Pile Driver and Extractor

Size (L×W×H)4000×2200×3600 mm
G.W.2500 KG
Weight of Hydraulic Hammer300 KG
Dia. Of Drill Shank70 mm
Impulsive Pressure10-16 MPa
Impulsive Frequency10-15 Hz
Pile Driving Force per Stroke of HammerAround 250 KN
Pile Extracting ForceAround 250 KN
Working height≤3000 mm

Hydraulic Driller

Size (L×W×H)2350×2200×3600 mm
G.W.2200 KG
Rotated Speed of Hydraulic Pump2200 r/min.
Working Air Pressure0.5-0.7 Mpa
Air Flow10 m3/min.
Diameter of Drilling Holes125-180 mm
Max. Drilling DepthAround 1500 mm
Displacement150 ml/r
Rotating Speed of Drilling Equipment190 r/min.
Working Efficiency250 mm/min.

Supply Vibratory Hammer Pile Driving
Packaging Detail:Export and sea-worthy standard special packing
Delivery Detail:15 days after receiving advance payment

Related Product for Supply Vibratory Hammer Pile Driving