storage tank opening the lid

storage tank opening the lid, 1.Material: SUS304/SUS316L, 2.Volume: 500L~15000L,larger, 3.Customized made, 4.CE - details see: https://www.machineto.com/storage-tank-opening-the-lid-10283116
Condition:NewPlace of Origin:Zhejiang China (Mainland)Brand Name:HSModel Number:HSST( Wide-open storage tank)
storage tank opening the lid
contact supplier for storage tank opening the lid


storage tankopening the lid
1.Style: custom

2.Capacity:,500L~15000L,larger

3.Material: SUS304/SUS316L

4.Usage:food,drink and wine storge,heating

5.Easy and simple to handle

5.processing character:single-layer/dual-layer/three-layer

Remarks:

MOQ1set
PackingStandard Export Packing by Sea
ShipmentWithin 50 days after down payment received
Payment Term30% T/T in advance, 70% balance to be paid before delivery;L/C

Technical parameters

1.Made of stainless steel

2.Humanized structure design and easy to operate.

3.polish inside outside

Applicable range:Used as liquid storage tank, liquid composing tank, temporary storage tank and water storage tank etc.

Ideal in field such as foods, dairy products, fruit juice beverages, pharmacy, chemical industry and biological engineering etc.

Structure characteristics:

1.Made of single-layer stainless steel structure.

2.Materials are all sanitary stainless steel.

3.Humanized structure design and easy to operate.

4.Transition area of interior wall on tank adopts arc for transition to ensure no dead comer of sanitation.

Configuration of tank:

1.Quick open manhole.

2.Various types of CIP cleaners.

3.Fly and insect resistant sanitary breathing cover.

4.Adjustable triangular bracket.

5.Dismountable materials input pipe assembly.

6.Thermometer (According to customer requirements).

7.Ladder (According to customer requirements).

8.Liquid level meter and level controller (According to customer requirements )

9.Eddy-proof board.

It can be made according to special requirements of customers . Total height (H) is in accordance with outlet height of 800 mm . If outlet height is changed , then total height(H) shall also be adjusted .

Main technical parameters

♣ Head and the inner tank weld detection

1.Air and water to the tank→2.Hold pressure for 12 hours → 3.Spray soapy water in the head and the inner tank of the weld

→4.If leakage, there will be a soap bubble on the head and the inner tank of the weld

♣ Conical bottom and inner tank weld detection

1.Cheer to the insulation layer → 2.Brush soapy water in the tank internal

→3.If leakage, there will be a soap bubble on the Conical bottom and the inner tank of the weld

♥service:

1)we will supply you with drawing before manufacturing.

2)we will firmly manufacture according to the drawing.
3)we will be in charge of installation.
4)we will send you our fittings for free if it is broken bt accident during 2 years.

♣Star products♣

storage tank opening the lid
Packaging Detail:standard export packing
Delivery Detail:40 days after confirmation

Related Product for storage tank opening the lid