STG-U plastic hopper dryer
Place of Origin:Jiangsu China (Mainland) | Brand Name:GREAT | Model Number:STG-U |
Machine name: STG-U plastic hopper dryer
STG-U series Hopper dryer is the best choice for drying non-engineering plastic. Its direct design makes it possible to be installed in the plastic forming machine for the direct drying with high efficiency and large time saving. The design of separate bucket part and base makes the material changing easy and fast .We supply 13 styles with weight from 15 to 1000KG. In addition, we also supply styles with functions of double production and magnetic base.
Characteristics:
A, Uniform distribution of the hot air: high thermal efficiency, reduce a lot of drying time.
B,Precise temperature controlling, adopt high precision temperature controller to eliminate the temperature error.
C,Save the time and labor: the separate design of the bucket part and hopper makes the material changing easy and fast.
D,Quite reliant design: it's nice and firm, easy to be installed. The multi safety equipment ensures the safe working.
E,The ejection speed is increased: the direct material falling reduces the melting time of the raw material.
Model | Volume (L) | Capacity (kg) | Heater power | Fan power | Out size (mm) | Weight (kg) | Capacity of molding machine matched (g) |
STG-80 | 80 | 50 | 3.9kw | 0.12kw | 850*460*1100 | 60 | 250-500 |
STG-U125 | 125 | 75 | 4.8kw | 0.12kw | 950*530*1200 | 75 | 500-1000 |
STG-U160 | 160 | 100 | 5.4kw | 0.25kw | 1650*650*1650 | 90 | 1000-2000 |
STG-U250 | 250 | 150 | 9kw | 0.37kw | 1720*7201950 | 110 | 2000-3000 |
STG-U315 | 315 | 200 | 12KW | 0.37KW | 1800*800*1950 | 135 | 3000-4000 |
STG-U400 | 400 | 250 | 15KW | 0.55KW | 1800*800*1950 | 200 | 3000-6300 |
STG-U500 | 500 | 300 | 18KW | 0.55KW | 2000*850*2200 | 240 | 4000-10000 |
STG-U800 | 800 | 500 | 24KW | 0.75KW | 2200*1100*2400 | 300 | 6300-12500 |
STG-U1250 | 1250 | 800 | 36KW | 1.1KW | 2750*1200*3425 | 500 | 12500-15000 |
STG-U1500 | 1500 | 1000 | 48KW | 1.1KW | 2825*1300*3725 | 600 | 15000-20000 |
Packaging Detail:Plastic film |
Delivery Detail:30 days after receiving your final payment |