Steel C purlin roll forming machine
1. C purlin roll forming machine, 2.High quality roll forming process, 3.Hydraulic precision cutting, 4.PLC automatic control - details see: https://www.machineto.com/steel-c-purlin-roll-forming-machine-10088569
Type:Steel Frame & Purlin Machine | Condition:New | Work Pressure:three shifts per day | Production Capacity:8-15m/min |
Place of Origin:Jiangsu China (Mainland) | Brand Name:HS | Model Number:custom made | Voltage:380V |
Power(W):11KW | Dimension(L*W*H):8000X1200X1200mm | Weight:approx 4 tons | Certification:ISO |
Warranty:one year | After-sales Service Provided:Engineers available to service machinery overseas | Forming profile:C profile, C purlin | Forming thickness:0.5-2, 1.5-3 or more |
Main steps:14 | Operation:touch screen operation with switch button | Cutting:Hydraulic cutting | PLC:Panasonic/Mitsubishi |
Inverter:Yaskawa/Panasonic | Encoder:Omron | Color:green or as per your requirement | Shipment:one 40 GP container |
C Purlin Roll Forming Machine
Machine Components
(1) Manual/Hydraulic Un-coiler 1 set
(2) Leveling Unit 1 set
(3) Roll-Forming M/C 1 set
(4) Punching Unit(optional) 1 set
(2) Leveling Unit 1 set
(3) Roll-Forming M/C 1 set
(4) Punching Unit(optional) 1 set
(5) Hydraulic Cutting Unit 1 set
(5) PLC Control System 1 set
(6) Product Table 1 set
(5) PLC Control System 1 set
(6) Product Table 1 set
Flow chart
Decoiler --> leveling --> roll forming--> hole punching (optional) --> automatic cutting --> output
Main Technical Data(for reference)
1) forming thickness: 1.5-3mm according to user's need
2) forming width: 600mm depends on profile sizes
3) roll stations: 14
4) motor power: 5.5-30kw
5) hydraulic power: 3-7.5kw
6) cutting: hydraulic mould cut
7) control system: PLC automatic control
8) un-coiler: manual or hydraulic
9) un-coiler capacity: 3-5 tons
Packaging Detail:One 40 GP container for shipmentseaworthy nude packing, using steel wire and wood block to fix the machine inside container, and using the film cover the machine for dustproof |
Delivery Detail:about 30-45 days |