Small wood sawdust dryer with good quality and reasonable cost
Condition:New | Type:Spray Drying Equipment | Place of Origin:Henan China (Mainland) | Brand Name:ALC |
Model Number:ALC-I | Voltage:380v 50hz 3phase | Power(W):5.5kw | Model:ALC-I |
Applied raw materials:sawdust, wood powder, biomass powder | Capacity:250-400kg/h | Output:3200-4800kg/day | Drying principle:remove moisture by hot air |
Power:4kw | Quality:good | Guarantee:1 year |
Small wood sawdust dryer with good quality and reasonable cost
Brief introduction:
1) Small wood sawdust dryer is widely used for drying materials like sawdust, rice hull, milling wheat straw, corn stalks etc small granular materials.
2) ALC-I and ALC-III model are equipped with one fuel stove, and they are proper for drying materials with moisture below 30% till 8%. ALC-II is with two fuel stoves and is proper for drying moisture from 50% to 8%.
Structure and drying process:
1) Small wood sawdust dryer is equipped with one fuel boiler, inlet, steel pipe, exhaustblower (fan), cyclone.
2) First, the wet materials are put into the hopper. Then the fuel boiler generates hot air which mixes with wet materials
and then is sucked into the pipes by the exhaust blower (fan) quickly.
3) And then hot air is flowing andgoingthough the curving pipes and buffer (drying chamber) of dryer, thus wet materials is finished to dry, and the dried materials are expelled out by the exhaust blower (fan).
4) Small wood sawdust dryer reduces the moisture to 8-12% with the advantages of lowercost consumption andhighefficiency.
Main technical parameter:
Model | Capacity (kg/h) | Power (kw) | Max dia of input(mm) | Weight(kg) |
ALC-I wood sawdust dryer | 250--400 | 5.5 | 3 | 1200 |
ALC-II wood sawdust dryer | 400--600 | 7.5 | 3 | 1700 |
ALC-III wood sawdust dryer | 800--1000 | 5.5 | 3 | 1800 |
Small wood sawdust dryer with good quality and reasonable cost :
Contact us through Ellie:
Small wood sawdust dryer with good quality and reasonable cost
Packaging Detail:standard export packing |
Delivery Detail:15 days after prepayment |