SL-700 spraying machine pistol to paint ceilings and wall
Place of Origin:Shanghai China (Mainland) | Brand Name:Shenglong | Model Number:SL-700 | Power (KW):0.8KW/220V |
Flow (L / min):0-10 | The level capacity of transmission:10(m) | The vertical capacity of transmission:10(m) | Speed (rpm):0-1200 |
Capacity ( L):20-30 | Length (mm):700 | Width (mm):400 | Height (mm):850 |
Weight (kg):11kg |
SL-700 spraying machine pistol to paint ceilings and wall
With advanced design, suitable for leak stoppage project, waterproof spraying project
Coating project applications
Coating inside and outside of the room
Coating of cement mortar, dry powder mortar, waterproof grout, ceiling, wall, art work, rockworks, sculptures and so on.
Spray operational rule
1. Before starting, add fresh water into the hopper and regulate the speed to the middle-high speed in order to achieve the effect of wetting pipe, only a short running and then draining the water.
2. Putting the even material stirred into the hopper, and then locking pulp exit of main machine and the pipe & nozzle.
3. Before spraying, filling the pressure of air compressor to 8kg (matched air compressor 0.26-0.36m) and then connected to the nozzle.
4. After connecting to power, putting the gunpoint aiming the hopper, adjusting the air pressure and the speed until achieving the best state of fogging, shutting down the machine but non-stop wind.
5. After the accurate Debug, immediately move the nozzle and spray jets to the construction site work.
6. During the construction process, the pipe is filled with paints, not suitable for parking too long. If the power is failure, you should immediately dismantle the pipe to clean.
7. If filling pressure in the pipe, before dismantling & cleaning, you must put the cloth on it to protect your eyes, avoiding injury.
8. If starting the machine fails, first check whether the fire drills is broken or not and should replace it immediately.
9. Cleaning the body during the working or completion, making sure wetting the electric drill & box, avoiding damage.
10.After completion of working, must clean up the hoppers, pipes, nozzles, and rotary joints so as to work tomorrow
11.If detecting the exit of paint is weak power after a long time to work, you have to replace the pressure pump.
12. If it suddenly appears without feeding material in the work, while motor is still working, it proves that the nozzle has been plugged. You should immediately stop working and clean the nozzle, and then continue to work.
13. Nozzle is damageable (including the pressure pump). The standard nozzle pore is 4mm. When the fogging of nozzle is not satisfactory, you should immediately replace the nozzle.
Technical Terms&Dimension
Power (KW) | 0.69KWX220V |
Flow (L / min) | 0-10 |
The level capacity of transmission | 10(m) |
The vertical capacity of transmission | 10(m) |
Speed (rpm) | 0-1200 |
Capacity ( L) | 20-30 |
Length (mm) | 700 |
Width (mm) | 400 |
Height (mm) | 850 |
Weight (kg) | 11kg |
Contact Person: Lesley
Mobile:+86-139 1737 1510
Tel: +86-21-51860079-814
Fax: +86-21-6806 0355
Packaging Detail:Carton |
Delivery Detail:within 5 days upon receipt your full payment |