SJFM1000-1800 laminate machine
Type:Coating Machine,Laminating Machine | Condition:New | Application:Food | Automatic Grade:Automatic |
Driven Type:Electric | Voltage:380V | Power:110-180KW | Packaging Type:WOODEN CASE |
Packaging Material:Plastic | Place of Origin:Zhejiang China (Mainland) | Brand Name:YILIAN | Model Number:SJFM |
Dimension(L*W*H):1300*8000*3000 | Weight:20 | Certification:CE | After-sales Service Provided:Engineers available to service machinery overseas |
Color:According To Customer Demand |
Model of SJFM Double Mainframe Extrusion Film Complex Machinery Unit, ushered in foreign advanced technique, finished double-sale film technical advanced type of airplane at domestic, the equipment used to need produce and complete compound materials at one time multi-layer like milk box, syrup box ,drink box and etc., it is an ideal equipment of producing asepsis wrapper.
The products take the material like paper, plastic film, spinning and non-woven cloth or Al foil as raw materials. The materials (inter-layer compounding) through casting in one processing. They are widely applicable for packing food and medicine (for example: cups, instant noodles bowls, packing bags for feed , adhesive tape cloth, snack boxes and non-woven cloth ) Its PLC is of man-machine interface that can centrally control. It’s integrally designed with machine, electricity and gas system. It has a mould die with high precision, high-speed high-effective mixing screw rods. The user can fast exchange the filter screen. It has the second unwinding frame which can rotate within 360-degree. It can be additionally assembled with a single extruder, double extruder s, which can extrude in multi layers at the same time.
Application range:
Paper-plastic complex, plastic-plastic complex, aluminum-plastic complex,
Paper-aluminum plastic complex, alf-adhesive series.
Producing methods:
Single shower membrance complex
Tree-level (sandwich) complex
Multi-level complex (with seven-level complex at one time)
Packaging Detail:WOODEN CASE |
Delivery Detail:About 30 days from the date of receipt of 30% down-payment |