Single-side Pressure 3-Roller calendar/calender/calendaring/calendering machine

It's used for the calendering of pure cotton, chemical fiber, wool and its blended fabrics. - details see: https://www.machineto.com/single-side-pressure-3-roller-calendar-calender-calendaring-calendering-machine-10278953
Place of Origin:Jiangsu China (Mainland)Brand Name:BroadenwinModel Number:1800mm 2000mm 2600mm 2800mm 3200mm 3600mm 4200mm 4800mm 
Single-side Pressure 3-Roller calendar/calender/calendaring/calendering machine
contact supplier for Single-side Pressure 3-Roller calendar/calender/calendaring/calendering machine


The product is used for the calendering of the pure cotton, chemical fiber, wool and its blended fabrics; it can also be used for the roll compacting of building materials, plastic pacing materials and paper. If furnished with schreinering and embossing roller, it can also be used for the after-finish of schreinering and embossing.

NoItemscontents
1PatternVertical 3 rollers. The top roller is teating steel mirror roller, the middle roller is soft roller, and the bottom roller is steel carrier roller.
2Working width1800, 2000, 2200, 2400, 2600, 2800, 3000, 3200, 3400, 3600, 3800, 4000, 4200, 4400, 4600, 4800, 5000
3Running Speed5-70m/min
4Ma pressure between rollers60T, 80T, 100T, 120T, 150T
5Operating temperature of the mirror roller≤220°C

Factory Overlook

Certificates

Workshop

Enterprise Management

Service Process

A. To introduce the characteristics of products, slove the questions raised by customers in brief and record the special requirements of customers.

B. To supply several solution to customers for reference according to the requirements of customers and offer prices depending on different solution.

C. To decde the final scheme and sign the contract.

D. According to the final Scheme, organize the operation and offer customers the installation drawing. Send the engineer to prospect on spot, if necessary.

E. After the equipment arrives on site, our engineer shall provide a free instruction in erection on site, debugging after installation and technical training.

F. After we received the telephone from customers, we will try our best to instruct customers to solve the problem; if customers really cannot knock over the engineers shall arrive on site a minute earlier as soon as possible and prevent from fear of disturbance in the rear:

In China a. Within 500 kilometers, the engineer arrives within 24 hours at the latest;

b. Within 1000 kilometers, the engineer arrives within 48 hours at the latest;

c. Beyond 1000 kilometers, the engineer arrives within 72 hours at the latest;

G. Within the year when the equipment is brought into operation, our after-sales engineers shall repay visits customers at irregular intervals and give suitable suggestions to customers for reference, according to the actual use. Meanwhile, we will ask customers for suggestions for improvement, so that we will make long-term progress in technology.

Single-side Pressure 3-Roller calendar/calender/calendaring/calendering machine
Packaging Detail:wooden case
Delivery Detail:70 days after the commencement of the order

Related Product for Single-side Pressure 3-Roller calendar/calender/calendaring/calendering machine