Silica sand special Triple -drum rotary dryer
Condition:New | Type:Rotary Drying Equipment | Place of Origin:Henan China (Mainland) | Brand Name:songling |
Model Number:various | Voltage:380v | Power(W):5.5-22 | Dimension(L*W*H):depends on your orders |
Weight:different model different weight | Certification:ISO9001:2000 | Warranty:within 12months | After-sales Service Provided:Engineers available to service machinery overseas |
producaion capacity(t/h):2.5-36 | power:5.5-75 | reducer ratio:16.46-41.52 | weight(t):7.5-105 |
color:as your need | length:1m-25m | Delivery Detail:15-30 working days | Location site:Henan province of China |
Spare parts:provided for a long period | product name:drum rotary dryer |
Introdution
the rotary dryer made by our company is mainly used in building materials,metallurgy,chemical plant,cement plant for drying of limestone slag,coal power,slag,clay stone.this dryer is formed by rotary body, raw material feeding plate, lifting blade,driving device,supporting device and sealing ring.
Features
the dryer has advantages of reasonable structure,high efficiency,low energy consumption and convenient for transportation.
Advantages
- occupying area just equal to one drum rotary dryer
- recycle drying to save energy 60%
- driven by tug not gear and pinin
Rotary drier Structure
this dryer is formed by rotary body, raw material feeding plate, lifting blade,driving device,supporting device and sealing ring.
Rotary drier working principle
Rotary dryer mainly consists of rotary body, raw material feeding plate, lifting blade, driving and supporting device, sealing ring and etc.
The raw material plate which is arranged reasonably with chargeable angles in order, throws moisture materials into the rotary cylinder. The water will be separated
from the materials by hot airflow and changed into vapor to be discharged into the atmosphere. Then the material would be dried.
Rotary drier specifications
Packaging Detail:Wooden or steel box standard export packing, suitable for delivery |
Delivery Detail:15-30 working days |