Shawarma Machine EB-RG01
Condition:New | Type:Sausage,Meat Processing Machinery | Application:0 | Automatic Grade:Automatic |
Production Capacity:1000 | Place of Origin:Guangdong China (Mainland) | Brand Name:cosbao | Model Number:BN-RG01 |
Voltage:220/380V | Power(W):14W | Dimension(L*W*H):496X600X821 | Weight:0 |
Certification:CE | Warranty:1 | After-sales Service Provided:Overseas service center available | Material:Stainless steel 430/304 |
Features:
◊ Whole body made of stainless steel,attractive outline design,simple structure,easy operation.
◊ Three groups of high efficiency heating elements,independently controlled.
◊ Each group of heating element have three gears.
◊ The diameter of the kabobs is less than 400mm.
RelatedParameter:
1. Brand Name: CosBao
2. Model No.: EB-RG01
3. Gas Class:NG/LPG
4. Powre: 50KW
5. Net Weight: 39Kgs
6. Size: 530x520x920mm
7. Packing Size: 570x560x930mm
Company Profile
Foshan Nanhai Baonan Kitchen Equipment Factory is a professional
stainless steel commercial kitchen equipment manufacturer which
specializes in the industry for more than 10 years since 1998.It
comes with a variety of products and most of them with the
CE certification, mainly including service trolley, bain marie,
worktable ,cabinet, sink bench, shelves, electric gas equipment
and other kind of western kitchen equipment widely used in
western restaurant, fast food, supermarket, and snack bar.
For unremitting pursuit of perfect design technology and
quality, Baonan continue to import advanced equipments,
such as digital controlled punching, cutting, bending,
welding and so on. And it also realizes the modernization
of equipment, standardization of date and responsibility
of detailing in the production. With the rapid development,
its market expanded to Europe, North and South America,
Middle East, Africa, Southeast Asia, Australia ect.
For more further information about our company
and products, welcome for calling or visiting our company.
Showroom:
Packaging Detail:Export carton or according to your requirement |
Delivery Detail:About 20 days after prepayment received |