Shandong Turnkey Micro Beer Brewing Equipment
Processing:Concentrator | Place of Origin:Shandong China (Mainland) | Brand Name:SD-Breweries | Model Number:SD-1000 |
Processing Types:Carbonated Beverage | Thickness:2-3mm | Heated way:Electricity or LPG | Temperature measurement:Bi-metal themometer |
Bottom cone:60-75 degree cone | Material:red copper | Insulation material:polyurethane | Certification:ISO9001:2000/CE |
1.The Brew house is sized to produce at least 2000L of cold wort (68°F/20°C) at a density range of11° P to 15° P. The Brewhouse pumps selected are made by SUS 304 and are controlled byvariable frequency drives (VFD’s). A main operator panel controls the Brewhouse pumps; the panel is located on the platform. All the process valves will be manual and connected via stainless tubing into a diverter panel. All of the unitanks are temperature controlled by individual digital controllers.
2.Basic configuration
Model No. list | |
saccharify system | Lauter tun |
Mash kettle | |
Mash pump | |
Combined pipes | |
Frequency inverter | |
crusher | |
Heat exchanger | |
Oxygen adder | |
Fermenting tanks | Fermenting tank |
Valve pipe | |
Cooling pipe | |
Thermal meter | |
Pressure meter | |
Cooling system | Cool water tank |
evaporator | |
refrigerator | |
Ice water pump | |
Pipe & valve | |
Controlling system | Power controlling cabinet. |
Meter controlling board | |
Refrigerator board | |
PLC control board for option | |
Washing system | Washing tanks |
Mobile pump | |
Valve & pipe | |
Beer sale section | Little wooden keg |
Beer valve | |
Soft pipe |
3.technic parameter:
| |||
Material | SUS 304 | Brewhouse size(1000L) | 1460*2500mm |
Color | Metal Color | Fermenting tank size(2000L) | 1460*3200mm |
Thickness | 2-3mm | Glycol chiller tank size(3000L) | 1800*2000 |
Heated way | Electricity or LPG | Malt mill capacity | 500kg/h |
Temperature measurement | Bi-metal thermometer | Refrigerator | 7P*2 |
Insulation material | polyurethane | Floor Space | 35-50m2 |
Controlling way | automatically or PLC | Payment terms | L/C, T/T |
Bottom | cone | Package | Steel frame and wooden case |
Certification | CE/ISO9001:2000 | Delivery date | 30 days |
MOQ | 1 set | Service | 1-3 years for the entire unit. |
4.others:
Packaging & Delivery
Packing details:Packing with steel stainless steel and wood cases.
Delivery details:Delivery time within 40 days from Qingdao.
Trade terms:
Payment: By T/T or L/C
100% payment if the total amount is less than USD10,000
40% deposit and 70% balance before shipment if the total amount is more than USD10,000
Delivery time: 10-50 working days, subject to the capacity of the equipment
The terms of the delivery: FOB, CFR, CIF
MOQ: 1 Set
Service:
1. Providing beer production technology, brewing formula
2. Providing cost analysis, brew house design, equipment production
3. Free installation debugging and person training service.
4. Main machine guarantee for 36 months, all life service.
Fresh beer to every litres of 2.5 dollars price calculation (hotel price2.5-12.5 dollars/liter, apparent consumption level and decide!
Packaging Detail:1.by independent containers or by bulk carriers 2.plastic film, steel frame, wooden case or according to the customers |
Delivery Detail:less than one month after receiving your 40% deposit |