SC200 construction elevator

SC200 construction elevator, 1.Accessories for elevator parts, 2.Complete safety device, 3.Special for high-rise construction - details see: https://www.machineto.com/sc200-construction-elevator-10098908
Place of Origin:Shandong China (Mainland)Brand Name:BetopModel Number:SC200After-sales Service Provided:Engineers available to service machinery overseas
Color:Red/blue/orange/silverSling Type:Rack and pinionMain electrical system:SchneiderMain structure of cage:Punched aluminum sheet
Model of motor:YZZ132M-4Certification:ISO9000,CE,GOST, Korea StandardSurface treatment:Blasting, Baking finished, galvanizedCage dismensions:3*1.3*2.2
Motor power:11KW*2, 11kw*3, 15kw*2, 12kw*2,13kw*2Usage:Special for high-rise building's construction  
SC200 construction elevator
contact supplier for SC200 construction elevator


SC200 construction elevator

Protective Measures of construction hoist:

1. A Master switch On the operation board: When the button closed, unexpected action to other buttons can not let cabin working.

2. Anti-falling safety device(with Centrifugal breaking system ): When all other protection device losing action, it can brake the cabin from falling.

3. Mechanical inter-locking door: when the cabin running it can close by itself from protecting people from dropping.

4. Overload calling device.

5. upper and lower travel limit: They can limit the cabin go over the top mast.

6.The top mast section have no rack in order to limit the cabin overrunning and dropping .

7. Manual button:You can operate the botton to let the cabin go down wheninterruption of power supply .

8. Emergency switch: When the cabin losing control and over-runing, you can operate the button.

Main technical parameters:

1. Construction hoist of common models

CharacteristicModelRated LoadingLifting SpeedMotor Power

Double cabin

SC200/2002×2000kg33m/min2×(3×11kw)
SC150/1502×1500kg33m/min2×(2×15kw)
SC100/1002×1000kg33m/min2×(2×11kw)

Single cabin

SC2002000kg33m/min3×11kw
SC1501500kg33m/min2×15kw
SC1001000kg33m/min2×11kw

2. Construction hoist with Interver

Characteristics

ModelRated LoadingLifting SpeedMotor Power

Double Cabin

Low-speed

SC200/200D2×2000kg0-33m/min2×(3×11kw)
SC100/100D2×1000kg0-33m/min2×(2×11kw)

Mid-speed

SC200/200Z2×2000kg0-55m/min2×(2×11kw)
SC100/100Z2×1000kg0-55m/min2×(2×11kw)

Single

Cabin

Low-speed

SC200D2000kg0-33m/min3×11kw
SC100D1000kg0-33m/min2×11kw

Mid-speed

SC200Z2000kg0-55m/min2×11kw
SC100Z1000kg0-55m/min2×11kw

Product details:

1. Production process: Strict material selection— blanking— inspection — welding— inspection— Blasting — inspection —Baking finished or galvanized— inspection — Finished Product

2. The product can be customized according to customers'requirements(drawing, specifications and so on).

A:The Mast section(color is variable) is made of seamless pipe.(The high quality seamless steel pipe is good verticality, anti-pressure, anti-aging, thickness and so on)

B:Main structure of cage is made of high-quality steel after bending.(The bended steel is firm, good verticality, stability. Moreover it ensure stable of the whole structure)

C:The cage is boarded up by all punched aluminum sheet.(It is anti-aging , ante-rust, light-weight and beautiful in its service life)

D:Access door interlock device protects the saftey of people and materials

E:Equiping with fall arrestor device

F:Equiping with interver in variable frequency construction hoist

Workshop Details and Transport Details:

1.All Production Line adopt standard of the fixture, mould, gauge

2.Workshop 5S mangement style

3.Each Construction Elevator should be testing-run and adjustment in Factory

4.Diffrent driven system

5.Construction Site

6.Transport to Qingdao(China) port

7.Exibition in Qingdao(China)

8.International certification

SC200 construction elevator
Packaging Detail:Construction hoist seaworthy container in nude(40HQ)
Delivery Detail:within 15 days after confirm the order

Related Product for SC200 construction elevator