SC200 construction elevator

SC200 construction elevator, 1.Accessories for vulnerable elevator part, 2.Impller blasting, 3.Special for high-rise building - details see: https://www.machineto.com/sc200-construction-elevator-10098082
Condition:NewPlace of Origin:Shandong China (Mainland)Brand Name:BetopModel Number:SC200
Rated Loading Capacity(kg):2000kgHoisting Speed:33m/minMax Lifting Height:250mDimension(L*W*H):3.0*1.3*2.2
Loder Weight:2000kgAfter-sales Service Provided:Engineers available to service machinery overseasColor:Red/orange/blue/silver/your requirementMain electrical system:Schneider
Sling Type:Rack and pinionCertificate of quality:ISO9000,CE,GOST, Korea StandardUsage:High buildings, Tower, Chemny, Bridges and so on.Service:Installation service
Surface treatment:Blasting, Baking finished, galvanizedMotor power:3*11kw, 2*11kw, 2*15kw, 2*12kw, 2*13kwModel of motor:YZZ132M-4Voltage/Frequency:380v/50hz Can be arranged to your requirement
SC200 construction elevator
contact supplier for SC200 construction elevator


SC200 construction elevator

Protective Measures of construction hoist:

1. A Master switch On the operation board: When the button closed, unexpected action to other buttons can not let cabin working.

2. Anti-falling safety device(with Centrifugal breaking system ): When all other protection device losing action, it can brake the cabin from falling.

3. Mechanical inter-locking door: when the cabin running it can close by itself from protecting people from dropping.

4. Overload calling device.

5. upper and lower travel limit: They can limit the cabin go over the top mast.

6.The top mast section have no rack in order to limit the cabin overrunning and dropping .

7. Manual button:You can operate the botton to let the cabin go down wheninterruption of power supply .

8. Emergency switch: When the cabin losing control and over-runing, you can operate the button.

Main technical parameters:

1.Construction hoist of common models:

CharacteristicModelRated LoadingLifting SpeedMotor Power

Double cabin

SC200/2002×2000kg33m/min2×(3×11kw)
SC150/1502×1500kg33m/min2×(2×15kw)
SC100/1002×1000kg33m/min2×(2×11kw)

Single cabin

SC2002000kg33m/min3×11kw
SC1501500kg33m/min2×15kw
SC1001000kg33m/min2×11kw

2. Construction hoist with Interver :

Characteristics

ModelRated LoadingLifting SpeedMotor Power

Double Cabin

Low-speed

SC200/200D2×2000kg0-33m/min2×(3×11kw)
SC100/100D2×1000kg0-33m/min2×(2×11kw)

Mid-speed

SC200/200Z2×2000kg0-55m/min2×(2×11kw)
SC100/100Z2×1000kg0-55m/min2×(2×11kw)

Single

Cabin

Low-speed

SC200D2000kg0-33m/min3×11kw
SC100D1000kg0-33m/min2×11kw

Mid-speed

SC200Z2000kg0-55m/min2×11kw
SC100Z1000kg0-55m/min2×11kw

Adopting advanced technology, it can also be equiped with electrical overload warming device, auto landing-call equipment or autimatic leveling device according to your requirement.

A. D.O.L Common electrical type: This is the common one

B. PLC Electrical system type.The advantages like below:

1. Powerful anti-jamming performace.

2.Programmable design and electromagnetic wave shielding

3.Better In Adaptability: adapt to different working conditions.

4.Keep hoist in safe conditions by Detection and Recognition for machnical or electrical errors.

C.Inverter electrical system type: The most advanced type and have the following advantages:

1.Start / stop very stable: Start in low speed and decelerate to stop. It is so stable for equipment and comfortable for passengers

2.Ulta-low voltage starting: The starting voltage floating rate is within 20% (300v-450v, the normal is 380v))

3.Apparent Power saving: Inverter type can save power about 25%-40% compare with the common type

4. Mild performance: Prolong the service life of the rollers, brake block, pins, mechnical driven and electricals. Can decrease the friction and wear between each parts.

Product details:

1. Production process: Strict material selection— blanking— inspection — welding— inspection— Blasting — inspection —Baking finished or galvanized— inspection — Finished Product

2. The product can be customized according to customers'requirements(drawing, specifications and so on).

A: The Mast section(color is variable) is made of seamless pipe

B: Main structure of cage is made of high-quality steel after bending

C: The cage is boarded up by all punched aluminum sheet

D:Access door interlock device protects the saftey of people and materials

E:Equiping with fall arrestor

F:Equping with interver in variable frequency construction hoist

Workshop Details and Transport Details:

1.All Production Line adopt standard of the fixture, mould, gauge

2.Workshop 5S mangement style

3.Diffrent driven system

4.Construction site

5.Each Construction Elevator should be testing-run and adjustment in Factory

6.Exhibition in Qingdao(China)

7.Transport to Qingdao(China) port

8.International certification

SC200 construction elevator
Packaging Detail:Construction hoist seaworthy container shipment in nude(40HQ)
Delivery Detail:within 15 days after confirm the order

Related Product for SC200 construction elevator