SC200/200 construction cargo elevator
Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:Betop | Model Number:SC200/200 |
Rated Loading Capacity(kg):2000kg*2 | Hoisting Speed:33m/min | Max Lifting Height:250m | Dimension(L*W*H):3*1.3*2.2 |
Loder Weight:2T/cage | After-sales Service Provided:Engineers available to service machinery overseas | Color:Red/blue/orange/silver | Sling Type:Rack and pinion |
Main electrical system:Schneider | Main structure of cage:Punched aluminum sheet | Model of motor:YZZ132M-4 | Motors:11KW*2, 11kw*3, 15kw*2, 12kw*2,13kw*2 |
Rated loading:2T/cage | Usage:Special for high-rise building's construction | Certification:ISO9000,CE,GOST, Korea Standard | Surface treatment:blasting,Baking finished ,galvanize,Painting |
SC200/200 construction cargo elevator
Adopting advanced technology, it can also be equiped with electrical overload warming device, auto landing-call equipment or autimatic leveling device according to your requirement.
1.High precise accessories and durable main parts
2.Good qualified raw materials and strict producting techniques
3.GB/T19001-2000-ISO9001:2000 certificate of quality
4. International standards certificate
Main structure of the product:
a. Cage:single and double
b. Master section:Adopt Welding Robort to weld, reliable in quality and elegant in appearance.
c. Cabin(operating board):provide a comfortable environment for the driver
d. Attanchment frame:the connection device between frame rail and building to ensure the stability of frame rail and all the structure.
e. Safety device:floor-call device, autimatic leveling device, overloading warning device and so on.
All the structure adopt Tooling fixed technology to ensure stable perfomance and stability.
The main technical parameters:
1.Construction hoist of common models:
Characteristic | Model | Rated Loading | Lifting Speed | Motor Power |
Double cabin | SC200/200 | 2×2000kg | 33m/min | 2×(3×11kw) |
SC150/150 | 2×1500kg | 33m/min | 2×(2×15kw) | |
SC100/100 | 2×1000kg | 33m/min | 2×(2×11kw) | |
Single cabin | SC200 | 2000kg | 33m/min | 3×11kw |
SC150 | 1500kg | 33m/min | 2×15kw | |
SC100 | 1000kg | 33m/min | 2×11kw |
2. Construction hoist with Interver :
Characteristics | Model | Rated Loading | Lifting Speed | Motor Power | |
Double Cabin | Low-speed | SC200/200D | 2×2000kg | 0-33m/min | 2×(3×11kw) |
SC100/100D | 2×1000kg | 0-33m/min | 2×(2×11kw) | ||
Mid-speed | SC200/200Z | 2×2000kg | 0-55m/min | 2×(2×11kw) | |
SC100/100Z | 2×1000kg | 0-55m/min | 2×(2×11kw) | ||
Single Cabin | Low-speed | SC200D | 2000kg | 0-33m/min | 3×11kw |
SC100D | 1000kg | 0-33m/min | 2×11kw | ||
Mid-speed | SC200Z | 2000kg | 0-55m/min | 2×11kw | |
SC100Z | 1000kg | 0-55m/min | 2×11kw |
Zinc-plated Mast Section
Driving system
The Fall Arrestor
The cage is boarded up by all punched aluminum sheet
Access door interlock device
Workshop details
Transport to Qingdao Shandong port
Loading into container
Construction Site
Testing site
Exhibition in Qingdao Shandong
International Certification
Packaging Detail:Construction hoist seaworthy container in nude(40HQ) |
Delivery Detail:within 15 days after confirm the order |