Sand Drier,Sand Drying Machine,Three Cylinder Sand Dryer
Condition:New | Type:Drum Drying Equipment | Place of Origin:Henan China (Mainland) | Brand Name:HR |
Model Number:2.8*24 | Voltage:380V | Power(W):4-75KW | Weight:5.1-97T |
Certification:ISO9001-2000 | Warranty:one year without wearing parts | After-sales Service Provided:Engineers available to service machinery overseas |
Introduction of Sand dryer:
Sand dryeIt mainly consists of rotary body, raw material feeding plate, driving and supporting device, etc. It is mainly used for cement, chemical, metallurgical, building materials industries. Its advantages are as follows: high dry capacity, smooth rotation, low energy consumption, easy operation, high output and so on.
Main Features and benefits of Sand dryer:
1)Sand dryer is used widely .
2)Sand dryer has a strong adaptability of materials and it can dry a large verity of materials.
3)The operation is very simple and reliable
working principle of sand dryer:
Materials are sent to hopper of rotary dryer by belt conveyor or bucket elevator.The barrel is installed with slope to horizontal line. Materials enter the barrel from the higher side, and hot air enters the barrel from the lower side, materials and hot air mix together. Materials go to the lower side by gravity when the barrel rotates. Lifters on the inner side of barrel lift materials up and down to make materials and hot air mix completely. So drying efficiency is improved.
model (m) | diameter (m) | length (m) | gradient | rotate speed (r/m) | weight | power | volume (M3) |
φ0.6×8 | φ600 | 8 | 3-5 | 8 | 5.1 | 6-4 | 2.26 |
φ0.8×10 | φ800 | 10 | 3-5 | 7.2 | 6.9 | 6-4 | 5.02 |
φ1.0×10 | φ1000 | 10 | 3-5 | 6.73 | 7.5 | 6-5.5 | 7.85 |
φ1.2×12 | φ1200 | 12 | 3-5 | 5.8 | 13.1 | 6-11 | 13.31 |
φ1.5×12 | φ1500 | 12 | 3-5 | 4.8 | 22.3 | 6-15 | 21.2 |
φ2.2×14 | φ2200 | 14 | 3-5 | 3.2 | 52.8 | 30 | 53.22 |
φ2.4×18 | φ2400 | 18 | 3-5 | 3 | 73.3 | 37 | 81.43 |
φ2.8×24 | φ2800 | 24 | 3-5 | 2.59 | 97 | 75 | 147.8 |
Packaging Detail:standard export |
Delivery Detail:3-25 days after advance payment |