Rotary drum Drying machine (popular in Rusia,India,Africa0
Type:Hot Air Furnace | Place of Origin:Henan China (Mainland) | Brand Name:Zhongzhou | Model Number:ZZGT |
certificatiom:ISO9001:2008 | moter power:4-30kw |
Working principles :
tube dryer mainly consist of rotary body ,raw material feeding plate ,driving and supporting device ,etc .Its principle of operation :the raw material plate which is arranged reasonably with changeable angles in order ,throws moisture materials into the rotary cylinder ,then water will be separated from the materials by hot air-flow and changed into vapour to be discharged into the atmosphere ,then the materials would be dried .
Temperature control (it is ordered and chosen by the customers)
This product series are popular in the material-drying process in concrete, mines, coal mines building
materials, chemical, food supplies, and fertilizer product, etc. industries. In order to control the temperature of the
drying machine Thermocouple that can show the temperature change is collocated on the exit and entrance
equipments, which offers evidence for better controlling the temperature (350-380celsius) of the tube
technical data
Type(m) | Output(t/h) | Motor Power(kw) | Motor Type | Type of Speed Reducer | Speed Ratio | Weight(t) |
Φ1.2*10m | 2.5 | 7.5 | Y160M-R3 | ZL50-16-1 | 13.5 | |
Φ1.5*12m | 3.3-4.9 | 10 | Y160L-6B3 | JZQ500-111-2F | 18.9 | |
Φ1.5*15m | 4-6 | 18.5 | Y200L-6 | JZQ500-111-2F | 21 | |
Φ1.8*12m | 4-6 | 11 | Y200L-6 | ZQ50-1611-2 | 16.46 | 22.33 |
Φ2.2*12m | 7-12 | 18.5 | Y160L-6 | JZQ650-111 | 31.5 | 37.6 |
Φ2.2*14m | 7-12 | 18.5 | Y160L-6 | JZQ750-111 | 31.5 | 40 |
Φ2.2*16m | 12 | 30 | Y225M-6 | JZQ750-111 | 31.5 | 45 |
Φ2.4*14m | 12 | 30 | Y250M-6 | JZQ750-111 | 31.5 | 51 |
Φ2.4*18m | 10-13 | 37 | Y250M-6 | ZL85-13-1 | 27.16 | 54 |
Φ2.4*20m | 10-14 | 37 | Y250M-6 | ZL85-13-1 | 27.16 | 54.14 |
Φ3*20m | 25 | 55 | Y250M-4 | ZL100-16-1 | 41.52 | 78 |
Φ3*25m | 32-36 | 75 | YR280M-4 | ZL100-16-1 | 41.52 | 104.9 |
Packaging Detail:in bulk or as client request |
Delivery Detail:within 20 days after receving your prepayment |