Roof Panel Forming Machine,Machine,Roll Forming Machine,Roof
Place of Origin:Zhejiang China (Mainland) | Brand Name:SMT | Model Number:YQD137 | After-sales Service Provided:Engineers available to service machinery overseas |
Size:Blue | Usage:Roofing Sheet Making Machine | Market:Ukraine, Russia | Weight of Line:9600KGS(main machine,not including decoiler) |
Size of Line(L*W*H):11600mm*2060mm*1500mm |
This roofing sheet roll forming machine is the special equipment for continuous rolling and cold-forming on steel sheet. It adopts coiling steel sheet as the raw material, decoiling, continuous rolling and cold-forming, automatically cut to the size and specification which is required, and output the finished panels. The equipment adopts PLC control, AC frequency and adjusting the speed technology, and it realizes the continuous automatically production, therefore, it is really a new type of energy-saving and high-effective producing equipment for steel structure.
Technical Parameters
No | Item | Parameter | Remark | |
1 | Suitable Material | Type | Color coating steel | |
Width(mm) | 1335 | According to customer's requirement | ||
Thickness(mm) | 0.4-0.7 | According to customer's requirement | ||
Yield Strength(Mpa) | 230-300 | According to customer's requirement | ||
2 | Forming Speed(m/min) | 20 | Not including cutting time | |
3 | Roller Material | No.45 steel | with hard chromized | |
4 | Cutting Model | Hydraulic Cutting | According to customer's requirement | |
5 | Power source | Type | 380V/3PH/50HZ | According to customer's requirement |
Machine Components
No | Name | Quantity | Remarks | |
1 | Decoiler | 1set | Up to customer | |
2 | Main machine | Pre-cutting device | 1set | Up to customer |
Feeding device | 1set | |||
Roll forming system | 1set | |||
Post cutting device | 1set | |||
Hydraulic system | 1set | |||
3 | Electric control system | 1set | ||
4 | Supporter/Automatic Stacker | 1set | Up to customer |
Detailed:
Machine Frame:
Roll Forming:
Cutting System:
Packaging Detail:The main machine is nude loaded in the container, the electric controlling box is packed by protect film and all the spare parts are put in the wooden box. |
Delivery Detail:60 days after receiving the down payment |