Rebar Thread Rolling Machine
Condition:New | Application:process parallel threads for rebar mechanical connection | Production Capacity:500 sets/month | Place of Origin:Hebei China (Mainland) |
Brand Name:BDJD | Model Number:JBG-40T Rebar Thread Rolling Machine | Voltage:380V | Power(W):4KW |
Dimension(L*W*H):1250*750*1050mm | Weight:500KG | Certification:ISO 9001 | After-sales Service Provided:Engineers available to service machinery overseas |
Brand name: BDJD
Rebar No.: rebar dia14mm-40mm
ModelName: JBG-40T Rebar Thread Rolling Machine
Voltage:380V
Power:4KW
Weight:500KG
Head Rotate Speed: 40-62r/min
The Max Thread Length:100mm
Feature: Easy and convenient operation; No Pollution; No more Material Wast; Nostriction of the weather.
Thread angle:60 ° /75 °
Jindi Rebar thread rolling machine series is designed to process straight screw thread on ribbed rebar head. It is the key equipment to realize the rebar mechanical splicing.
The JBG-40T model rebar thread rolling machineJBG-40T is our patented product developed in October 2012, it is designde for processing parallel threads for rebar mechanical connection. It can process HRB335, HRB400, HRB500 hot rolled ribbed reinforced bar with diameter 14-40mm. In addition to all features of all above types, the machine can start once when processing left-handed thread, and it can finish rebar rib peeling and threads rolling continuously. With extended plate thread processing length could reach 100mm. It is especially fit for long rebar thread peocess in bridge and tunnel.
1. Main technical data:
Gross weight | 500KG |
Electric motor power | 4KW |
Working voltage | 3-380V,50HZ |
Dimension | 1250*750*1050mm |
Output rotate speed of reducer | 62 R.P.M |
Available rebar diameter | 12,14,16,18,20,22,25,28,32,36,40,50 |
Thread Pitch | 2.5mm, 3.0mm and 3.5mm |
As we have strong technical force, we can also adjust the machine on the basis of existing model to adapt to customer's special demand.
2. Feature
1: Simpleoperation, no need for professional technicians, fast splicing on construction site;
2: High production efficiency, 300 to 500pcs of thread could be produced during one shift.
3: The splices could be produced in advance without influencing the construction period;
4: Economic, environmental, low investment for the equipment.
Machine process procedure:
Machines:
Spare Parts:
Company and Workshop:
Certificates
If you have any requires, Plese feel free to contact me.
Packaging Detail:iron frame and carton |
Delivery Detail:within one weeks |