Quick Change Z Purlin Roll Forming Machine

quick change z purlin roll forming machine, 1.good quality and best afterservice, 2.professional experience - details see: https://www.machineto.com/quick-change-z-purlin-roll-forming-machine-10088303
Type:Steel Frame & Purlin MachinePlace of Origin:Shanghai China (Mainland)Brand Name:AllstarModel Number:ZGSY
product:quick change z purlin roll forming machineThickness:2--3mm(5mm Max)Color:as per requirementuse:making purlin and support
brand:allstarcertificate:CE  
Quick Change Z Purlin Roll Forming Machine
contact supplier for Quick Change Z Purlin Roll Forming Machine


Our company has been verified by Bureau Veritas.

quick change z purlin roll forming machine ,cold roll forming machine

1. Working Flow

Decoiling the sheet→sheet guiding → coil strip leveling → roll forming → punching for horizontal hole/vertical hole → measure

length → cutting the panel → panels to the supporter.

2.Technical Specification of C, Z purlin machine:

1). Installation size: 10500mm×100mm×1500mm


2).Quantity of stands: 15


3).Roller material: Gcr15


4).Main motor power: 11KW


5).Hydraulic station power: 11KW


6).Hydraulic station pressure:18-20Mpa


7).Material of blade: Cr12


8).Electrical system: PLC variable frequency control

9).Forming speed: 9-10m/min.

10).Thickness of the plating chromium of roller surface: 0.05mm

3.Advantage of our z purlin roll forming machine

1). The product of the machine offers high compressive strength and good straightness.


2). High automatization, like auto cutting and punching


3). Quick and convenient installation helps reduce labor force.

Picture for your reference:

A).normal z purlin roll forming machine

B).Quick change z purlin roll forming machine

4.Payment term

1).Payment Term: 35% T/T in advance, 65% TT at the sight of B/L Copy.

2).Delivery Time: Within 60 Work Days after receipt of the down payment.

3).Warranty: 12 months since the date of B/L.

4).Installation and Commissioning: 1 or 2 professional engineers will be sent for installation and commissioning, and the buyer should pay 100 USD/day for each one, besides, the accommodation and the round-trip ticket are also on the buyer’s side

Quick Change Z Purlin Roll Forming Machine
Packaging Detail:standard package for quick change z purlin roll forming machine
Delivery Detail:50-60 working days after receiving the down payment

Related Product for Quick Change Z Purlin Roll Forming Machine