QTZ5611 Dubai Tower Crane Built by Our Company

Dubai Tower Crane We Built, 1) China Well-known Trademark, 2) With 22 National Technical Patents, 3) CE ISO IAF CNAS - details see: https://www.machineto.com/qtz5611-dubai-tower-crane-built-by-our-company-10103290
Feature:Tower CraneCondition:NewApplication:Construction Use Dubai Tower CraneRated Loading Capacity:6T
Rated Lifting Moment:800Max. Lifting Load:6TMax. Lifting Height:220mSpan:56M
Place of Origin:Henan China (Mainland)Brand Name:MIAO YAN(China Well-known Trademark )Model Number:QTZ5611Certification:ISO CE IAF CNAS
Warranty:One YearAfter-sales Service Provided:Engineers available to service machinery overseasMax Load at Jib End:1.1tHoist Speed:80/40/8.8m/min or 40/20/4.4m/min
Slewing Speed:0-0.65 turn/minLuffing Speed:40/20 m/minPower:32.8kwStandard Section Adding Speed:0.56m/min
Max Wind Pressure:250N/M2Working Voltage:380+-5%VWorking Temperature:-20-+40 degreesHonor:China Well-known Trademark
QTZ5611 Dubai Tower Crane Built by Our Company
contact supplier for QTZ5611 Dubai Tower Crane Built by Our Company


QTZ5611-6 DUBAI TOWER CRANE WE BUILT

PART1 , QTZ5611-6 DUBAI TOWER CRANE WE BUILT PERFORMANCE INTRODUCTION

PART2, QTZ5611-6 DUBAI TOWER CRANE WE BUILT ATTACHMENT

PART3, MAIN PARAMETER OF QTZ5611-6 DUBAI TOWER CRANE WE BUILT..

PART4, DESCRIPTION of QTZ5611-6 DUBAI TOWER CRANE WE BUILT

1) Steel structure

Steel is the essential safety guarantee for tower crane. The steel we use for our tower crane is tower crane usage special square steel

from Wuhan Iron and Steel Group. Steel material for those essential parts like lifting jib,tower top, frame etc is 16 Manganese Steel.

Thus to assure safety, advance and high performance of the crane.


2) Hoisting Mechanism
We apply following technology of mature three velocity-variation pole motor, big center distance speed reducer, big diameter drum to effectively
enhance the life span of crane. And the equipped rope mechanism solves the rope disorder issue effectively. The crane is specially equipped with
hydraulic push brake to assure stable and reliable braking and easy maintenance.


3) Swing Mechanism
The speed change system is by rheostat variation of wound rotor motor or by frequency change system. The swing of tower crane is flexible,
stable, exact positioning, highly reduced swing impact force and with high safety performance.


4) Luffer
It applies double-speed or three-speed motors for speed change control according to the jib length, easy running control, low impact force,
high operation stability and high efficiency.


5) Control System
The Electric elements are from Schneider Company to assure high system reliability. The control cables uses air plug for easy and fast
assembling and maintenance.


6) Operating System
Newly spacecraft type cabinet room with air conditioning system, wide eye view, high consideration of operator comfortableness and maximally
to low down operation fault rate.


7) Security Guards
Except for using the common security devices, we uniquely equips high definition operation tracking monitor system which can thoroughly
supervise the lifting hook, ground and construction building and can assure safety operation when with sight blockage.

PART 5, OUR TECHNICAL UTILITY MODEL PATENT OF DUBAI TOWER CRANE WE BUILT

1)Tower Crane, No2291555
2)Tower Crane, No2294881
3)Rotating Mechanism for Tower Crane, No2295341
4)A Counterweight Assembly and the Tower Crane with it, No2356201
5)Tower Crane, its Working Platform and the Connection Structure of the Operation Platform, No2351079
6)Tower Crane, No2293032
7)Tower Crane, No2289961

PART 6, DUBAI TOWER CRANE DETAILS PRESENTATION

PART 7, THE MANUFACTURING PROCESS OF DUBAI TOWER CRANE

Note for the pictures in the process

1)Strict Material Control, using the national standard steel with high quality and advanced parameters
2)The robot welding machine of the tower crane standard section
3)Using “speed control by rheostat variation” and “speed control by frequency variation”in winding motor to ensure the performance and safety.
4)The slewing body of tower crane
5)We have a strict quality checking system, it is the jacking girder bedstand.
6)High quality product presentation.

PART 8, PRODUCTION WORKSHOP OVERVIEW

PART 9, PART OF OUR DUBAI TOWER CRANE CASES

PART 10, WHY GREAT MACHINERY MANUFACTURE COMPANY

Because we are
1)China Famous Manufacturer Of Construction Machinery
2)China Well-Known Trademark
3)30 Years Research And Project Experience
4)22 National Level Technical Patents
5)AAA Rating Enterprise Of Quality And Credit (National Level)
6)President Company Of Xingyang Zhengzhou Construction Machinery Association
7)Total Area Of 280,000 Square Meters, 12 Production Lines
8)Total 1858 Stuffs, 123 Professional Technical Engineers, 156 Sales And Service Center In China
9)Registered Capital 15Millions RMB
10)ISO CANS IAF Certified Enterprise

PART 11, ABOUT US

WELCOME TO YOUR INQUIRY FOR MORE DETAIL INFORMATION ON DUBAI TOWER CRANE ON SALE..
MISS MEI TSAO

MOB: 0086-18625771286
SKYPE: ZZGREATWALL

QTZ5611 Dubai Tower Crane Built by Our Company
Packaging Detail:As Per Your Request on Packing of Dubai Tower Crane We Built
Delivery Detail:15 Days after Confirm Order of Dubai Tower Crane We Built

Related Product for QTZ5611 Dubai Tower Crane Built by Our Company