QL90-250 two rings manual heat fusion welding machine
Condition:New | Place of Origin:Zhejiang China (Mainland) | Brand Name:QINGLIANG | Model Number:QL90-250 two rings manual |
Input Voltage:220V | Current:15.9A | Power:3.5KW | Dimensions:90, 110, 125, 140, 160, 180, 200, 225, 250 |
Usage:suitable for PE and PP pipes and fittings | Certification:ISO9001: 2008 | After-sales Service Provided:Engineers available to service machinery overseas | operating way:manually |
1. Product information
Model No. | QL90-250 two rings manual |
Materials | aluminum alloy casting, 45# steel |
Welding level(Φ, mm) | 90, 110, 125, 140, 160, 180, 200, 225, 250 |
Docking deviation | ≤0.3mm |
Working temperature | 220°c |
Total power consumption | 3.5KW |
Voltage | 220V |
Electric current | 15.9A |
Temperature deviation | ±3°c |
Environment temperature | -5……40°c |
Time required to reach soldering temperature | <20min |
Materials can be welded | PE PP PB PVDF HDPE PVC |
Packing | plywood case |
MOQ | 1 PCS |
Delivery Port | FOB NINGBO/SHANGHAI, China |
Payment Terms | full T/T with 30% deposit |
Sample | available |
Certificate | ISO9001: 2008 |
2. Usage
Hydraulically operated heat fusion welding machine, suitable for PE and PP pipes and fittings. High quality design and construction provides an excellent machine for welding both on the worksite and in the factory. The use of high quality Aluminum casting allows for lower weight without compromising strength and performance.
3. Function and feature
1. Suitable for butt fusion DN90-250 PE and PP pipes.
2. It is composed of fixture, heating plate and milling cutter.
3. The fixture has one ferrule, can locate the pipes accurately, and easy to adjust the bit wrong side.
4. The removable fixture makes to weld some special pipes more easily.
4. Operating demonstration
a. Clamp the pipes, make it have 5-8 cm distance between these two pipes.
b. Cut the ends of the pipes with milling cutter, take away the milling cutter after forming continuous cutting.
c. The heater is placed into machine, both pipe ends are brought together against the heater.
d. After heating the ends of the pipes, take away the heater quickly. Then, butt joint the pipes immediately. Adjust the butt fusion pressure according to the diameter of the pipes.
e. When the welding temperature is same to the environment temperature, move the pipe away from the machine.
5. Certificates
6. Corporate Image
7. Package picture
Packaging Detail:plywood case: 800*510*580mmgross weight: 83.00KG |
Delivery Detail:5 days |