QL800-1200 hydraulic butt fusion welding machine
1.Product: butt fusion machine, 2.Material: 45# steel, aluminum alloy, 3.Certificates: ISO9001, CE, 4.Warramty period: 1 year - details see: https://www.machineto.com/ql800-1200-hydraulic-butt-fusion-welding-machine-10135195
Condition:New | Place of Origin:Zhejiang China (Mainland) | Brand Name:QINGLIANG | Model Number:800-1200 hydraulic |
Input Voltage:380V | Current:55.3A | Power:21KW | Dimensions:800, 1000, 1200 |
Usage:suitable for PE and PP pipes and fittings | Certification:CE, ISO9001: 2008 | operating way:hydraulically | machine:butt fusion machine |
1 . Product information
Model | QL800-1200 hydraulic |
Materials | aluminum alloy casting, 45# steel |
Welding level(Φ, mm) | 800, 1000, 1200 |
Docking deviation | ≤3mm |
Temperature deviation | ±3°c |
Total power consumption | 21KW |
Voltage | 380V |
Electric current | 55.3A |
Working pressure of hydraulica system | 0-6Mpa |
Woking temperature | 225°c±5°c |
Environment temperature | -5....45°c |
Time required to reach soldering temperature | <20min |
Materials can be welded | PE, PP, PB, PVDF, HDPE, PVC |
Packing | plywood case |
MOQ | 1 PCS |
Delivery Port | FOB NINGBO/SHANGHAI, China |
Payment Terms | full T/T with 30% deposit |
Lead Time | within 15days after getting deposit |
Certificates | ISO9001: 2008, CE |
2. Usage
Hydraulically operated butt welding machine is suitable for PE and PP pipes and fittings. High quality design and construction provides an excellent machine for welding both on the worksite and in the factory. The use of high quality Aluminum casting allows for lower weight without compromising strenghth and performance.
3. Function and Feature
1. QINGLIANG plastic pipe welding machine is a ring-type welding tool.
2. It is widely used to weld the flat of HDF, PP-R pipes.
3. Easy to operate, display pressure, have watch to time, intelligent temperature control, self-locking to protect the pressure
4. Certificates
5. Corporate Image
7. Package
Packaging Detail:plywood pallet |
Delivery Detail:15 days after getting the 30% deposit |