QL63-160 four rings chinese welding machine
Condition:New | Place of Origin:Zhejiang China (Mainland) | Brand Name:QINGLIANG | Model Number:QL63-160 four rings manual with watch |
Input Voltage:220V | Current:11.4A | Power:2.5KW | Dimensions:63, 75, 90, 110, 125, 140, 160 |
Usage:suitable for PE and PP pipes and fittings | Certification:ISO9001: 2008 | After-sales Service Provided:Engineers available to service machinery overseas | Operating way:manually |
product:chinese welding machine |
1. Product information
Model No. | QL63-160 four rings with watch |
Materials | Aluminum Alloy Casting,45# steel |
Welding level(Ø, mm) | 63, 75, 90, 110, 125, 140, 160 |
Docking deviation | ≤0.3mm |
Temperature deviation | ±3°c |
Total power consumption | 2.5KW |
Voltage | 220V |
Electric current | 11.4A |
Working temperature | 220°c |
Environment temperature | -5……40°c |
Time required to reach soldering temperature | <20min |
Materials can be welded | PE PP PB PVDF HDPE PVC |
Packing | plywood cases |
MOQ | 1 PCS |
Delivery Port | FOB NINGBO/SHANGHAI, China |
Payment terms | full T/T with 30% deposit |
Certificates | ISO9001: 2008 |
Sample | Available |
2. Usage
Hydraulically operated chinese welding machine, suitable for PE and PP pipes and fittings. High quality design and construction provides an excellent machine for welding both on the worksite and in the factory. The use of high quality Aluminum casting allows for lower weight without compromising strength and performance.
3. Function and feature
1. Suitable for DN160-315 PE and PP pipes.
2. It is composed of operating platform, fixture, heating plate and milling cutter.
3. The fixture and operating system are separate, easy to operate under the ditch.
4. The fixture has two ferrules, can locate the pipes more accurately, easy to adjust the bit wrong side
5. Using solenoid valve to control the cylinder running, it makes the operating easier and safer
4.Operating demonstration
a. The carriage Jawws are clamped around the pipe.
b. The pipe ends are faced flat & parallel to each other to give a good mating for fusion.
c. The heater is placed into machine, Both pipe ends are brought together against the heater.
d. The pipe soaks against the heater and begins to melt. Both ends are brought together and beg in to bond immediately
e. The pipes are held at pressure until cool leaving a joint stronger than the pipe.
5. Certificates
6. Corparate Image
5. Package
Packaging Detail:plywood case: 890*530*470mmtotal gross weight: 75KG |
Delivery Detail:5 days |