QJ color steel roofing tile forming machine
1.CNC with PLC and hydraulic driving method, 2.high speed with motor power 3kw, 3.high quality and competitive price - details see: https://www.machineto.com/qj-color-steel-roofing-tile-forming-machine-10086098
Type:Tile Forming Machine | Tile Type:Colored Steel | Use:Roof | Place of Origin:Hebei China (Mainland) |
Brand Name:QJ | Model Number:28-220-1100 | quality system:ISO9001:2000 | control system:PLC |
motor power:3KW | processing speed:2-6m/min | thickness of material:0.2-0.8mm | material of cutting blade:Cr12 |
advantage:durable |
color steel roofing tile forming machine
1 We can manufacture as per customers’ requirement
Suitable material | Color steel sheet , galvanized steel sheet |
Main motor power | 3KW with Cycloidal reducer |
Hydraulic station power | 3KW |
Hydraulic oil | 36# |
Thickness of material | 0.2mm~0.8mm |
Diameter of principal axis | Φ70mm |
Material expand width | 1000mm-1250mm |
Electric tension | 380V 3phase 50HZ or as the customer's requirements |
Material of roller | High grade 45# forged steel (plated chrome plating on surface) |
Rolling galvanization thickness | 0.05mm |
Processing speed | 2-6m/min |
Processing precision within | 1.00mm |
Material of cutting blade | Cr12 mould steel with quenched treatment |
Kind of drive | 0.6 inch chain link bearing model 6210 |
Roller station | 13 Rollers |
2 The chart of process flow
Decoiling-active feeding-roll forming-measuring length-cutting to length-product to stand
3 Service
We provide the technical support for whole life.Meanwhile, if any parts go broken and not artificial damage,
we will send you new ones for free.When need the technician to go abroad, we will arrange the technician.
But the buyer should take all the cost, including Visa, Roundtrip ticket,suitable accommodation and pay the
service fee to the technician 50$ per day.
4 Contact information
Sales excutive:Miss Wendy Chen
Telephone:0086-0317-8259018
Company:Cangzhou Forward Roll Forming Machinery Manufacturing Co., Ltd.
Packaging Detail:main machine is nude,and control box is packed by carton box frame. one complete equipment need one-40-feet container to hold. |
Delivery Detail:30 working days on receipt of the deposite |