QG Air Stream Dryer
Type:Flash Drying Equipment | Place of Origin:Jiangsu China (Mainland) | Brand Name:Yutong | Model Number:QG |
Processing Types:powder | Processing:drying |
Summary of the products
This dry model, there are many supplies adapting to, besides supplies that the basic model mentioned, as follows, methazolamide , A. B. C intermedia , A. B. S resin , A. S. C, white carbon black, oxalic acid catalyst , promoter m. d. M, precipitate the charcoal powder, oxidize the titanium two times, activated carbon , Fluorine sodium silicate , Fluorine stone ore, silica gel powder, synthetic resin, calcium phosphate, polypropylene resin, aureomycin, lean towards sodium silicate , candy chloric acid coffee dreg , sulphuric acid sodium , sulphide ore , ground phosphate rock , blue BB , tetracycline , three iron oxide rust , calcium carbonate , maize albumen , iron oxide rust , gypsum are slow.
Characteristic of the equipment
The dry intensity is large, large in equipment investment province, ability of evaporating, but from 50kgH2O/h-2000kgH2O/h;
Dry time is short, suitable for the temperature sensing supplies , the finished product does not keep in touch with the external world , pollution-free, of high quality;
The equipment is offered in a complete set, can choose the steam to heat or form a complete set and use fire coal , fuel , gas hot-blast furnace ,etc. in heat source.
The dry equipment of air current of basic model, it is little to suitable for loose form , viscidity, the finished product is the supplies of particle and powder. This procedure hints in order to shoulder and press the air current drily, users can choose to press the form dry method according to product performance .
Technical parameters:
model | moisture to bew evaporated kg/h | equipped power kw | occupied area m2 | High m |
QG50 | 50 | 7 | 16 | 9 |
QG100 | 100 | 13 | 26 | 11 |
QG200 | 200 | 21 | 35 | 11 |
QG250 | 250 | 24 | 51 | 15 |
QG500 | 500 | 43 | 78 | 16 |
QG1000 | 1000 | 100 | 105 | 18 |
QG1500 | 1500 | 150 | 200 | 18 |
Packaging Detail:As demands. |
Delivery Detail:45-50 days after received deposit. |