Purlin Roll Forming Machine
Purlin Roll Forming Machine, 1.Of high quality and good appearance, 2.Good after-sale service, 3.CE, 4.PLC computer control - details see: https://www.machineto.com/purlin-roll-forming-machine-10088296
Type:Steel Frame & Purlin Machine | Condition:New | Place of Origin:Shanghai China (Mainland) | Brand Name:Allstar |
Model Number:ZGM-300 | Voltage:380V 50 Hz 3 phase | Power(W):11 Kw | Dimension(L*W*H):About 8000mm*800mm*1300mm |
Weight:About 8T | Certification:CE,BV | Warranty:1 year since the date of B/L on | After-sales Service Provided:Engineers available to service machinery overseas |
Product:Purlin Roll Forming Machine | ODM:Available | OEM:As your requirements | Color:As customer's requirements |
Size:As customer's requirements | Cotrol:PLC Computer Control | Video:Can offer if necessary | After-sale service:Engineers available to service machinry overseas |
UPurlin Roll Forming Machine
Technical parameter | |
Manual decoiler | |
Capacity | 3 T |
Feeding and leveling device | |
Function | it is used to release the head of coil, then feed into roll forming machine, making the coil straight and flat after decoiling. |
Structure | total 7 rollers, upper are 3 rollers and lower are 4 rollers |
Roll forming machine | |
Forming station | 11 steps |
Shaft diameter | 80mm |
Shaft material | high grade 45# steel |
Roller material | GCr15 steel, quenched and heated process |
Forming speed | 10-15m/ min |
Machine frame stand | welded structural steel |
Frame stand thickness | 18mm |
Punching & cutting & hydraulic station | |
Hydraulic power | 4 kw |
Hydraulic pressure | 20Mpa |
Cutter material | Cr12Mov quenching process |
Cutting length error | +/- 2mm |
Cutting module | 2 sets |
Electrical system | |
Voltage | 380V 50 Hz 3 phase |
Electrical control system | Japanese Panasonic PLC board |
Encoder electrical control system | Omron brand |
Touch screen | Panasonic brand |
Transducer | ABB |
Size of PLC board | 700mm*1000mm*300mm |
CE Certification
Packaging Detail:Normal container |
Delivery Detail:Within 50 Work Days after receipt of the down payment |