PT 250T TWIN RAM HYDRAULIC TRACK PRESS
Place of Origin:Fujian China (Mainland) | Brand Name:GT | Model Number:250 Ton hydraulic press machine for track chain | colour:blue |
standard:ISO9001-2000 |
Special devices
Stationary and portable hydraulic press for small , medium and large-size track chains
Lubrication devices for chains, rollers and idlers
Electromechanical track shoe wrench for screwing and unscrewing the shoe bolts on tracked vehicle chains
Track winder is designed for winding large , medium and small-size chains .
1.A detailed description
(1)Track link press machine , press link machine .
150tons, 200tons ,250tons, 300tons fit for all kinds of track link .
Quality guarantee at least 1.5 years .
Special design to make your work easier .
Including ,Hydraulic press motor , rolling machine ,and rolling frame .
(2)Such as300 Tons Hydraulic Link Press Machine Assemblyincluding:for your reference:
Hydraulic machine 2. Rolling machine and 3. Frames.
It can fix (assembly or disassembly) different pitches (<228mm) of track links likePC60~PC400, D2~D8.
The working voltage of standard motor is 220V/380V 50HZ. (110V 60(50) Hz are available)
2.Some pictures for your looking about hydraulic press machine for track chain.if you offer us model ,then we can make sure which model you need.
3. Chart.
Name | Qty | Note | |
pc | |||
300 Tons Twin Ram Hydraulic Track Link Press Machine | Rolling link machine | 1 | Motor 3KW, 220V/380V 50HZ |
Twin Ram Hydraulic machine | 1 | Motor 5.5KW, 220V/380V 50HZ | |
including packing | |||
Frame | 4 | 3 suqare, | |
1 triangle | |||
Assembling Mold | 6 | 154,171 ,175,190,203,216 pitch | |
Disassembling Mold | 2 | 1pc for <203pitch | |
1pc for >203pitch | |||
4.As long as you provide chart, the chain of parameters according to your offer can make different types of chain link.
5.Certificate.
6.Operational guidelines
(1)The working efficiency for assembling link is 10-14sets per hour
How to assembling link. please see video here?
http://www.tudou.com/programs/view/974WduRtksc/
http://www.tudou.com/programs/view/KJ2QnT2TIeQ/
http://www.tudou.com/programs/view/d1JYSkskCzI/
http://www.tudou.com/programs/view/13qcBGg06HU/
(2)The working efficiency for disassembling link is 6-8 sets per hour.
How to loose link , please see the video here?
http://www.tudou.com/programs/view/miIdDvR2IS0/
http://www.tudou.com/programs/view/0f_pdXTPtEw/
How to roll the link?
http://www.tudou.com/programs/view/1b6Av-XtPNE/
How to move link?
http://www.tudou.com/programs/view/fXrDQHbwras/
http://www.tudou.com/programs/view/1g3bYK_obxc/
Packaging Detail:In Pallet or strong package to gurantte it won't be damaged in the shippment |
Delivery Detail:within 30 days |