Plywood hot press
Plywood hot press machine, linyi plywood machine. - details see: https://www.machineto.com/plywood-hot-press-10345971
Condition:New | Type:Hot Press | Application:Plywood making | Pressure:500ton |
Place of Origin:Shandong China (Mainland) | Voltage:380v | Power(W):22.5kw | Weight:35ton |
Warranty:360daysart one: Processing technology : In the producing process, | After-sales Service Provided:Engineers available to service machinery overseas |
Description of the Spares | Remark | Q’ty | Unit | Unit Price(RMB) | Amount (RMB) | |
Rotary Peeling lathe( Spindle) | 1300mm | Set | ||||
Rotary Peeling lathe(Spindless) | 1300mm | Set | ||||
Rotary Peeling lathe(Spindless) | 2600mm | Set | ||||
Chopper | 1300mm | Set | ||||
Chopper | 2600mm | Set | ||||
Veneer dryer | 15layers 4kw | Set | ||||
Glue mixer | Dia800mm | Set | ||||
Glue spreader | 4'(1400mm) 3kw | Set | ||||
Pre press(4x8') | Separate part, pressure 400tons 18.5kw | Set | ||||
Hot press(4x8') | Separate parts, 15layers,pressure500tons,platen thickness 42mm 26kw | Set | ||||
Sizer(4x8') | Manual 30kw | Set | ||||
Sanding machine | 2 heads 150kw | Set | ||||
Board turnover machine | 3kw | Set | ||||
Hydraulic platform | 3kw | Set | ||||
Boiler | Set | |||||
TOTAL |
Installation & adjustment
- 1. Seller will send 1-2 technicians to guide the equipment installation and trial run.
- 2. The installation duration is about 10 days.
- 3. Buyer should pay the service fee of$50 each day per personfor seller’s technicians in the first 10 days.Buyer should pay the round trip ticket and board & lodging for seller’s technicians in buyer’s country.
- 4. The necessary conditions such as workshop, illumination and ventilation etc.
- 5. The construction of machine’s foundation support steel blocks.
- 6. The boiler and pipes & valves connected to the inlets/outlets of machine.
- 7. Hydraulic oil, thermal oil and fuel for boiler.
- 8. The necessary device, facilities and skilled worker for the installation and trial run.
- 9. Electric power, connected to main electric cabinet;
10.The necessary material such as impregnated paper, raw board etc.
11.The other relevant tools for the installation and trial run.
Warranty
- 1. The duration for quality guarantee is12 monthsafter installation and working the machine.
- 2. Within the duration, if machines fail to operate due to machine quality problem not to operator’s incorrect operation,Seller will send engineer to repair, the labor and material cost is free, the air tickets, board& lodging cost will be at the charge of Seller; beyond the duration, all service fee should be at the charge of Buyer.
- 3. Buyer pays food & room for Seller’s technicians in Buyer’s country.
Packaging Detail:Export safety package. |
Delivery Detail:60days |