plastic oil making plant/equipment pyrolysis waste plastic to oil
out put oil and carbon, 1.safe,.with full safety device and auto alrming system, 2.high oil rate, 2.easy to use - details see: https://www.machineto.com/plastic-oil-making-plant-equipment-pyrolysis-waste-plastic-to-oil-10213605
Place of Origin:Henan China (Mainland) | Brand Name:srp | Model Number:2200-6000 | steel plate q245r:capacity 5ton |
reactor thickness 14mm,16mm:reactor diameter 2.2m,long6.0m | per batch 15hours:shipped by two 40hq containers | reactor power 3.0kw:total power 11kw |
![plastic oil making plant/equipment pyrolysis waste plastic to oil](https://www.machineto.com/img/showcase/plastic-oil-making-plant-equipment-pyrolysis-waste-plastic-to-oil-10213605.jpg)
Our plant have been sold to India, Malaysia , Bangladesh, Pakistan, Lebanon ,Mexico, Europe,ETC, we have rich experience in producing and installation. Our plant with simple and safety design. our machine are
economic and practical.
Major parts
1.reactor
2.oil separator
3.cooling system
4.light oil tank
5.heavy oil tank
6.water sealing tank
7.waste gas burning system
8.speed reducer
9.dedust and desulfur system
10.waste gas burning system
11.electric cabinet
12.cooling tower
13.carbon discharge machine
14..steel wire pulling machine
Style | Feeding time(hours) | processing time(hours) | cooling time (hours) | Slag outlet time(hours) |
GM-5100 | 2 | 7 | 3 | 2 |
GM-6000 | 2 | 8 | 3 | 2 |
GM-2600-6000 | 3 | 10 | 3 | 3 |
GM-2800-6000 | 3 | 12 | 3 | 3 |
GM-2800-6600 | 3 | 13-14 | 3 | 3 |
installation in india
Item | Plastic Oil | |
Density | g/cm3 | 0.83-0.87 |
Freezing Point | oC | 10 |
flash point | oC | 40 |
Kinematic viscosity | mPa.s | 8 |
Combustion value | kJ/kg | 9500 |
\
![plastic oil making plant/equipment pyrolysis waste plastic to oil 2200-6000 plastic oil making plant/equipment pyrolysis waste plastic to oil](https://www.machineto.com/img/showcase/plastic-oil-making-plant-equipment-pyrolysis-waste-plastic-to-oil-10213605.jpg)
Packaging Detail:reinforce packing |
Delivery Detail:15 to 20days after deposit payment |