plaster of paris manufacture
Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:YUANTENG | Model Number:YT-GP |
After-sales Service Provided:Engineers available to service machinery overseas | quality:high |
Gypsum powder production line adopts boiling furnace, high-voltage electrostatic dust removing and other advanced equipment, it
gypsum powder production line capacity list :
Capacity/T | / Ton/hour | / Raw gypsumrock consumption T/year | Heat supplying way | Boiling furnace size |
20,000 | 2.7 | 24,000 | Heat conductive oil or steam | 4.5M×1.0M×1.2M |
30,000 | 4.2 | 36,000 | 4.5M×1.2M×1.4M | |
50,000 | 6.9 | 60,000 | 4.5M×1.4M×1.6M | |
60,000 | 8.3 | 72,000 | 4.5M×1.6M×1.8M | |
80,000 | 11.11 | 96,000 | 4.5M×1.8M×2.0M | |
100,000 | 13.88 | 120,000 | 4.5 M×2.0 M×2.2 M | |
150,000 | 20.83 | 180,000 | 4.5 M×2.2 M×2.4 M | |
200,000 | 27.77 | 240,000 | 4.5 M×2.4 M×2.6 M | |
300,000 | 41.66 | 360,000 | 4.5 M×2.6 M×2.8 M |
Brief Introduction
Natural gypsum generally includes dehydrate gypsum and anhydrous gypsum. In order to get the valuable materials, generally, we get semi-hydrated gypsum through heating the dehydrate gypsum.
Main Technology
gypsum mine ->first breaking ->second breaking ->grinding ->calcining ->aging ->finished products (CaSO4.1/2H2O)
Raw Materials
Content of CaSO4.2H2O in gypsum mine 80%
The grade of mine and the crystal configuration will influence the quality of semi-hydrated gypsum
If you have more questions about the gypsum powder production line,feel free to contact me.
Packaging Detail:wooden boxes,containers by sea or railway according to the disstance |
Delivery Detail:90 days after order confirmation |