plaster of paris machine 100tons per day
Condition:New | Application:Construction material | Automatic Grade:Automatic | Production Capacity:98% |
Place of Origin:SHN, Shandong, China (Mainland) China (Mainland) | Brand Name:Huisen | Model Number:HS130228 | Voltage:220V/380V |
Power(W):230kw | Weight:150tons | Features:saving energy | Certification:IS09001 |
Warranty:12 months | After-sales Service Provided:Engineers available to service machinery overseas | Capacity:30,000 t - 500,000 t | degree of automatic:Full-automatic |
Calcination system:Boiling furnace | Type 1:Hot oil drying | Type 2:Hot air drying | Type 3:Heat exchanger drying |
Cost:Lower | Evironmental:Friendly |
Gypsum powder production line
Gypsum powder production line adopts boiling furnace, high-voltage electrostatic dust removing and other advanced equipment.
1:Brief Introduction
Natural gypsum generally includes dehydrate gypsum and anhydrous gypsum. In order to get the valuable materials, generally, we get semi-hydrated gypsum through heating the dehydrate gypsum.
2:Main Technology
Gypsum mine ->Breaking ->Grinding ->Calcining ->Lifting ->Conveying ->Finished products (CaSO4.1/2H2O)
3:Raw Materials
Content of CaSO4.2H2O in gypsum mine should be more than 80%
The grade of mine and the crystal configuration will influence the quality of semi-hydrated gypsum.
4. Fuel variety:
Coal, natural gas, diesel oil, heavy oil, ect.
5. Advantages:
We can offer a basket of services of design, producing, installation, commissioning and training, as well as turnkey project for customers.
With a strong design team as the basis, we can supply equipments and production line with different configuration which are tailored to customers’ requirements. We guarantee whole-life service for our equipments.
We have a well-equipped laboratory which can assay raw material for our customers, and according to the test results, we can realize the finally debugging which reduced the cost for preliminary investigation and commissioning.
Packaging Detail:It needs about 8-10 containers(40 feet) to delivery the machine |
Delivery Detail:Within 2 months after receiving the down payment |