plaster machine for wall/wall plastering machine/auto rendering machine
Condition:New | Automatic Grade:Automatic | Power(W):1500 | Rendering Thickness:25 mm |
Rendering Height:4 m | Place of Origin:Hebei China (Mainland) | Brand Name:ZB | Model Number:ZB800-4A |
Dimension(L*W*H):800*650*480MM | Weight:150KG | Certification:ISO | Warranty:12 Months |
After-sales Service Provided:Engineers available to service machinery overseas | type:wall plastering machine |
wall plastering machine
ZB800-4A main features:
1. It is new machine instead of handmade in construction plastering area.
2. The capacity is as 15 professional plasterers.
3. The quality is subject to international wall plastering standard.
4. Very easy and simple to operation
5. Saving more than 20% raw material (cement &sand)
6.It can plaster the wall automatically and go up and down automatically.
7.It can plastering by one-time.The thickness of the ash can be adjusted.
8.Easy to move,without removing any parts of the machine.
9.It has large capacity hopper,you can put the ash/lime/gypsum in it one-time.
10.Easy to operate.One or two person can operate.
11.The quality is up to the international standard.Leakage protection device with high sensitivity, suitable for construction site safety and reliability
Technical data of automatic plastering machine:
ZB800-4A Technical data | |
Plastering Height | 0-5meters |
Plastering Thickness | 2-25mm |
Plastering Width | 80cm |
Capacity | 450 square meters/8 hours |
Dimensions | 800×650×480mm |
Voltage/frequency | According to your demands |
Weight | 150KG |
Surface | smooth |
Vibrator | 2 vibrators |
Juncture device | Yes |
Smoothing knife | Yes |
Perpendicularity degree | ≤2mm |
Level degree | ≤2mm |
Wall plastering machine VS Manual Work
The process of plaster the wall
Step 1.fix the machine
Step 2. load ash
Step 3. go up to the first plastering
Step 4. go down for the first smoothing
Step 5. the first section of plastering wall is finished
Step 6.repeat step1-5
Packaging Detail:wooden casses |
Delivery Detail:3-5 days |