Pit Type Tempering Furnace
Condition:New | Type:Tempering Furnace,Tempering furnace | Usage:Heat Treatment Boiler | Place of Origin:Henan China (Mainland) |
Brand Name:DS | Model Number:RJ2-25-6 tempering furnace | Voltage:380v | After-sales Service Provided:Engineers available to service machinery overseas |
Rated temperature:650℃ | Dimension:Diameter:400mm,Height:500mm | Power:25kw | Fuel:Electricity or gas |
Certification:ISO9001:2008 | Warranty:1 year |
Pit Type Tempering Furnace
Summary of tempering furnace
Pit type tempering furnace is cycle type furnace,mainly applied to rod and long axis parts for tempering heat treatment.It is consists of steel shell,door,lining,strong fan,crucible,electrical heating elements and electrical control cabinet,etc.
Characteristic of tempering furnace
1. The liner of furnace and wall body are made of ceramics fibre block,furnace bottom is made of ring high strength refractory bricks.
2. Heating elements is divided into multi area.
3. The furnace cover can be lifted or translation,is controlled by oil pumping station,motor,reducer and operation switch.
4. The circulation fan is installed on the furnace cover,fanblade is made with precision casting heat resistant steel impeller,big air volume,high wind pressure and long service life.
5.Electrical control system is consist of temperature measurement, regulation and control system,thermocouple,
control thermometer,recorder,silicon controlled, etc.It could control system independently,the PID regulation and control of furnace temperature is achieved.
Technical parameters of tempering furnace
Model | Rated temperature(°C) | Dimension(mm) | Power(kw) |
RJ2-25-6 | 650 | Φ400X500 | 25 |
RJ2-35-6 | 650 | Φ500X650 | 35 |
RJ2-55-6 | 650 | Φ700X600 | 55 |
RJ2-75-6 | 650 | Φ950X1200 | 75 |
RJ2-30-9 | 950 | Φ450X800 | 30 |
RJ2-70-9 | 950 | Φ600X1000 | 70 |
RJ2-90-9 | 950 | Φ600X1200 | 90 |
RJ2-50-12 | 1200 | Φ600X800 | 50 |
RJ2-80-12 | 1200 | Φ800X1000 | 80 |
RJ2-110-12 | 1200 | Φ800X1500 | 110 |
Packaging Detail:Depends on client's requirements. |
Delivery Detail:Within 50 days after receiving depoist of tempering furnace. |