personnel and materials Building hoist
Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:XINGDOU | Model Number:SC200, SC150, SC100 |
Rated Loading Capacity(kg):2000kg | Hoisting Speed:0-33m/min , 0-55m/min | Max Lifting Height:250m | Dimension(L*W*H):3*1.3*2.2m |
Loder Weight:2000kg | After-sales Service Provided:Engineers available to service machinery overseas | Type:personnel and materials Building hoist | Usage:Cargo & Passenger |
Driven Type:Rack and gear | Main electrical system:Schneider | Certificate of quality:ISO9000:2008 | Surface treatment:Blasting, Baking finished, Hot zinc Glavezied |
Color:Red/orange/blue/your requirement | Motor power:3*11kw, 2*11kw, 2*15kw, 2*12kw, 2*13kw | Voltage/Frequency:380v/50hz Changeable to your requirement | After-sale Service:Installation, commissioning, Maintencem,Opration Training |
Personnel and materials Building hoist
Adopting advanced technology, it can also be equiped with electrical overload warming device, auto landing-call equipment or autimatic leveling device according to your requirement.
1.High precise accessories and durable main parts
2.Good qualified raw materials and strict producting techniques
3.GB/T19001-2000-ISO9001:2000 certificate of quality
4.Adopt international standards approval certificate
Main technical parameters:
1. Personnel and materials hoist of common models:
Characteristic | Model | Rated Loading | Lifting Speed | Motor Power |
Double cabin | SC200/200 | 2×2000kg | 33m/min | 2×(3×11kw) |
SC150/150 | 2×1500kg | 33m/min | 2×(2×15kw) | |
SC100/100 | 2×1000kg | 33m/min | 2×(2×11kw) | |
Single cabin | SC200 | 2000kg | 33m/min | 3×11kw |
SC150 | 1500kg | 33m/min | 2×15kw | |
SC100 | 1000kg | 33m/min | 2×11kw |
2. Personnel and materials hoistwith Interver:
Characteristics | Model | Rated Loading | Lifting Speed | Motor Power | |
Double Cabin | Low-speed | SC200/200D | 2×2000kg | 0-33m/min | 2×(3×11kw) |
SC100/100D | 2×1000kg | 0-33m/min | 2×(2×11kw) | ||
Mid-speed | SC200/200Z | 2×2000kg | 0-55m/min | 2×(2×11kw) | |
SC100/100Z | 2×1000kg | 0-55m/min | 2×(2×11kw) | ||
Single Cabin | Low-speed | SC200D | 2000kg | 0-33m/min | 3×11kw |
SC100D | 1000kg | 0-33m/min | 2×11kw | ||
Mid-speed | SC200Z | 2000kg | 0-55m/min | 2×11kw | |
SC100Z | 1000kg | 0-55m/min | 2×11kw |
Main structure of the product:
a. Cage:Single or Double, With operation cabin or No operation cabin.
b. Mast section:Adopt Welding Robort to weld, jigs&fixture forming process, Blasting and baking finished, reliable in quality and elegant in appearance.
c. Tie-in:The connection device between frame rail and building to ensure the stability of frame rail and all the structure.jigs&fixture forming process, Blasting and baking finished, reliable in quality and elegant in appearance.
d. Safety device: Anti-falling device, Several speed limiters, Door limit switch, Access door Mechinical interlock, overload Indicator,floor-call device, autimatic leveling device, PLC error indicator and so on.
e. All the structure adopt Tooling fixed technology to ensure stable perfomance and stability
A:The cage is boarded up by all punched aluminum sheet , The sizecan be arranged to your requirement
B:Main structure of cage is made of high-quality steel after bendingand formed the cage whole structure design. (The bended steel is firm, good verticality, stability. Moreover it ensure stable under working)
C:The Mast section (color is variable) is made of seamless pipe.(The high quality seamless steel pipe is good verticality, anti-pressure, anti-aging, adaptable to different conditions)
E:Equiping with interver in variable frequency construction site passenger hoist (0-33m/min and 0-55m/min speed are avalible)
Workshop Details:
1. Production process: Strict material selection— blanking— inspection — welding— inspection— Blasting — inspection —Baking finished or galvanized— inspection — Finished Product
2. The product can be customized according to customers'requirements(drawing, specifications and so on).
Packaging Detail:seaworthy container paking in nude(40HQ) |
Delivery Detail:within 7-10 days after confirm the order |