Passed CE and ISO YTSING-YD-0409 Full Automatic Pipe Building Material Machine
Building Material Machine, Passed CE and ISO authentication, More professional, Payment:T/T - details see: https://www.machineto.com/passed-ce-and-iso-ytsing-yd-0409-full-automatic-pipe-building-material-machine-10081607
Condition:New | Type:Pipe Production Line | Pipe Material:Stainless Steel | Application:Drain Pipe |
Production Capacity:10-15 mtr./min | Place of Origin:Jiangsu China (Mainland) | Brand Name:YTSING | Model Number:YD-0409 |
Voltage:380V 50HZ or as your request | Power(W):11 K.W | Dimension(L*W*H):8000mmX800mmX1500mm | Weight:11.5t |
Certification:CE/ISO/SGS | Warranty:18MONTH | After-sales Service Provided:Engineers available to service machinery overseas | Thickness of coil to be process:0.5mm-0.6mm |
Load capacity:5 T | 2)Main motor power:5.5KW | Number of stations:23 sets | Rollers material:40Cr, hard Chrome Coated |
Shafts diameter:70mm | Cutting pressure:12 Mpa | Moter:Simens | Material of cutting die:Cr12 mold steel with quench treatment |
Shipment packing:one 40FT container |
Downspout Pipe Roll Forming Machine
Product Details:
Place of Origin: WUXI China (Mainland) | Brand Name:YTSING | Model Number:Piperoll forming machine |
Type:Tile Forming Machine | color:Bule | Use:Rolling curtain or others |
Packaging & Delivery
Packaging Detail: | Naked with film/ yellow paper |
Delivery Detail | 70days after received your deposit 30% |
Specification
Number of stations | 18 sets |
Thickness | 0.5-0.6mm |
Main power | 7.5KW |
Shipment packing | one 40FT container |
Forming speed | 10-15mtr./min(Not include shear) |
Complete Line Consist Of |
Decoiling |
Coil sheet guiding&feeding |
Roll forming |
Cut to length |
Product packing (manual) |
Technical Data
Productivity | Products as the drawing |
Set up time | 15 mins |
Working hours per day | 8 to 16 |
Line direction | Left to right |
Overall machine length required | 7.0M |
Approximate machine height | 1.5M |
Picture
Packaging Detail:Naked with film/ yellow paper |
Delivery Detail:70 days after deposit arrived |